    FibreFuture writes...

    What country's next? The Netherlands?
    The Netherlands is an odd one out.

    When I was a kid, mid 70's, my complete town was already facilitated by a underground TV-cable network facilitated by the local council. It was not that big, only 50,000 citizens. No antennas on the roof, at least not in the cities. We had around that time already 20 TV-stations and many more radio stations. After that the commercial stations were added, many more TV-stations were added (around 40) and I remember to be able to watch Italian TV in perfect quality. Talking mid 80's. By the time Internet came around, the network was made suitable to transport data. This meant that from the moment go, the incumbent Telecom company KPN had competition on the copper network. This resulted in a healthy competition on speed but also volume. Restricted volume was only a brief period introduced to be dropped for unlimited. Actually it was not advertised as unlimited. It was not a selling point any more or a differentiation so why advertise on it?

    At the start of 2000's the process of the past, councils building their own network repeated. This time with fibre. The competition on HFC actually slows down now the roll out and initiatives. Now before trolls are jumping, there is a major difference between Australia and the Netherlands, the HFC networks are maintained top notch in the Netherlands.

    At any case, no users are skipping out on poor broadband speeds.

    The incumbent Telecom company KPN "struggles" but some could call it "healthy competition". Their core asset is copper and they have troubles delivering on speed and quality. They attempted through KPNQWest to enter the fibre market but the company collapsed. They have been a target of Carlos Slim, but the Dutch Government execute a call option which resulted in that Carlos could not take-over KPN as the Government had a majority in shares.

    Why this tactic was not followed with NBNv1, don't ask me. You simply create call options and through a public listing you collect the capital. If a threat of take-over occurs, you simple call the option and raise your vote count. Capital is easy to collect on a fibre network as the returns are proven high. Large capital investors queue.

    The Netherlands is actually a nice example where regulation was very low and the initiative was left at large to the councils to compete with KPN. Some counsels worked together to create backhaul between towns, many initiatives were taken even in smaller cities and villages. In effect KPN was punished for not investing in their core business.

    There was no desire for the Dutch Government to actually protect KPN against the Counsil initiatives. The only time the Dutch Government swing into action was protecting foreign ownership of the company.

    The situation in Australia is much different. There always has been that desire to control the Telecom market in the benefit of major carriers. That clearly didn't work and we now receive the fruit of this strategy. We discover the fruit is rotten and we lack the courage with the Government and regulators to make a change.

    This failed strategy, results in no investors willing to participate in the Australia telecom market. And it doesn't matter if you are an entrepreneur or NBN Co. No private capital. Period. Who wants to invest in a market where the government and the regulators protect certain players through vested interests?

  • MrMac

    cej writes...

    Well your post had a lot of thought given to it and reminds me that Whirlpool should have a 'top posts' vote/ feature, so it does not get lost in thousands of Astroturfers vs true believers arguments.

    Very much agreed

    Tandem TrainRider writes...

    1) nbn� must ditch the 1gbps backhaul from the nodes, and install 10gbps up front.

    I'm not sure if this is as big an issue today as it is made out to be. Internet behaviour pattern's are fairly broad, even during a level of peak usage, and also constrainted by limitations of FTTN as well. To a certain extent I trust NBNCo to manage capacity appropriately, plus the cost of 10Gbps equipment today is unnecessary as a standard. I would however like to see more transparency and regulation in the future on capacity/CVC.

    I agree completely to all your other points, though I'd add to ditch the anti > 25Mbps attitude along with fibre. Libs won, their policy is in place, but now time to work towards best possible outcomes over the longer term. Importantly that means financially viable NBN.

  • Biocatalyst

    FibreFuture writes...

    Gotta bless the local papers through for brainwashing people into saying FTTP is crap and a waste of money. But when the green nodes come rolling through everyone is as silent as a mouse and says SFA about it.

    That is because the activation rates on FTTN/B are far, far lower than FTTP. Who would of thought?

    The activation rates on FTTP are around the 40%-50% mark whereas FTTN/B is around the 5% to 10%.

  • Deadly Chicken
    this post was edited

    noide@51561497 Tandem TrainRider writes...
    IMHO what's happening is there is now a complete dearth of new information re this project

    nbn�'s need to access the finance markets

    Good point, that has certainly helped kill off discussion. Everything has been discussed, and the facts and figures added up.
    Either way I don't think we are going to see a change, I got no sense that FTTdp was on the horizon, all this time and energy working on ways to squeeze more performance out of the copper. Is just to justify the approach "Look see this route we are taking you also can achieve higher speeds than we can do right now"

    But in reality its like making the most aerodynamic, lightweight, high performance horse cart. And racing it against cars, it only goes so fast, for so long before it rapidly falls behind.

    nbn� must ditch the 1gbps backhaul from the nodes, and install 10gbps up front.
    Good idea but ..
    1) I am pretty sure that they run 4 fibres, 2 active to provide 2 Gbps and 2 spare for future growth or upgrades (micronodes)
    still pathetic with 384 potential users per node, but if your point was more about the switching ability then ...
    The cost today is trivial
    2) I'm not so sure Malcom would agree with that, that basically requires refitting the nodes with 10 Gbps capable switching ... to 70,000 nodes, and then replacing the switching at the POIs. The difference in pricing between 1 Gbps switching and 10 Gbps switching at a retail level is in the order of 10 times its going to significantly impact costs. Hence it hasn't been done from the outset, because CapEx is supposed to be important to this mob.

    We need to stop greenfields copper/FTTN NOW!

    Too late, nodes are in place already. The sad thing is that even by nbns own reckoning greenfields FTTP is their cheapest technology.

    Tandem TrainRider writes...

    We need genuine community consultation.

    I don't see the value in this really. with a good roll out plan, sure consultation with the council to figure out how to avoid digging the same streets as some other utility, and councils could hold their own sessions for the public to pass on ideas if there was much interest in the area, but forcing nbn to do it would probably just slow things up imo.

    Ditch the anti-fibre attitude

    Apparently there isn't one.

    MrMac writes...

    I'm not sure if this is as big an issue today as it is made out to be.
    Well it depends on how many nodes actually get loaded up. It seems with current uptake on FTTN so low that it might not be an issue. but just simple maths 2 Gbps divided between 384 users, gives a maximum of 5Mbps each connection.

    that's way under the guaranteed minimums. its an issue for sure, how big an issue ?
    I suspect the route to upgrade will be as a particular node starts hitting the backhaul headroom, they will either start by adding the spare fibres, or consider upgrading that single node. Leaving users struggling for however long that process ends up taking I guess ? The problem is that the nodes service too many people, some from too far away, 4 fibres for 100 users would give much better results, but have 3 to 4 times as many nodes.

  • RockyMarciano

    FibreFuture writes...

    I'm not sure how reliable this site is but it looks like FTTH is even growing in Spain

    That is correct.
    Now for a pop quiz, what is the name of the company rolling out FTTH in Spain?
    Extra credit points for tie-in information :)

  • RockyMarciano

    https://broadbandworldforum.wordpress.com/2016/09/15/the-economic-impact-of-gigabit-connectivity/

    Reviewing the economic impact of gigabit connectivity, the FTTH Council determined that �communities with widely available gigabit access have per capita GDP that is 1.1 percent higher [than those without gigabit]� � accounting for a full $1.4 Billion in the US.

    Is that an NBN dog I see running away with its tail between its legs?
    Why yes, yes it is.

  • MrMac

    Deadly Chicken writes...

    Well it depends on how many nodes actually get loaded up. It seems with current uptake on FTTN so low that it might not be an issue. but just simple maths 2 Gbps divided between 384 users, gives a maximum of 5Mbps each connection.

    Capacity wise, it's unlikely that a node will be full loaded with 384 users. Then it's extremely unlikely that all connections will be fully utilized at the same time. Consumer behaviour varies across the timescale with different activities with varying bandwidth requirements, and varying bandwidth capacity at the premise. Even if the worst case did happen, which I would guess at < 1%, then sure upgrade that specific node to 10Gbps.

  • Visentinel

    I dont post much in these threads as my time to chat is to sporadic to engage in convo so i lurk and read mostly.

    Just sayin thanks to you guys for providing good info and article links to fill my spare time with good reading. I appreciate what you guys are doing here.

    :)

    My area got fttn and tho the sync is good and line stability is excellent i wish the network was better, after only 3 days the congestion in peak is awfull. 4 weeks on and Lastnight all i seen was 1500k/sec of the 7400k/sec capable.

    The school holidays is scary and i think im in for a world of hurt.

  • Friday at 9:38 am
    RockyMarciano

    https://twitter.com/SAD_NBN_FTTN/status/776570256189906944

    A user on FTTN 50mbps and a month of monitoring speeds.

  • Friday at 9:38 am
    Blackpaw

    MrMac writes...

    Then it's extremely unlikely that all connections will be fully utilized at the same time.

    Peak hour gaming and streaming around 7pm onwards

  • Phg

    Biocatalyst writes...

    activation rates on FTTN/B are far, far lower than FTTP. Who would of thought?

    The activation rates on FTTP are around the 40%-50% mark whereas FTTN/B is around the 5% to 10%.

    I'm still inclined to punt on the actually LNP strategy with the NBN and NBNCo to be

    1. Make it look like NBNCo is rolling out the network on time and budget (by changing the scope and goalposts)

    2. Then claim that activation rates are not high enough to make the Network financial viable or raise private sector funding required to finish the NBN/MTM. Shifting blame of this to RSP's, customers, social and MSM media, non-NBN Wireless Broadband alternatives and of course the previous Government.

    Everything that is happening at the moment with the NBN/MTM and NBNCo appears to fit into the above IMO.

    Where we go to from here is anyone's guess.

    With a high risk that any attempts to change course from here are going to be met with resistance from all sides, including Telstra, who i would have thought, would prefer to see the NBN/MTM completed ASAP, as per the current SOE, rather than take on the risk of inheriting a half complete NBN/MTM.

    If the LNP had more control of parliament, things might be different. But they don't have much control, and are not likely to get a much more control, if any at all, at the next Federal Election (early or on time).

  • RockyMarciano
  • Friday at 9:52 am
    Visentinel
    this post was edited

    Effit il put my 2 cents from my perspective of the avg older millennial, im 32.

    I had adsl2 here with a sync of 22 and it was enough barely for netflix on the tv and 2 users on youtube. During peak times it was bad but not bad enough to kill us it just made netflix drop hd and youtube drop to 480p.

    On fttn now its been great except for horrid peak time congestions, triple downstream to 62 and i love the upload, thing is after reading what people have pointed out here i can see why problems exist.

    Firstly the fttn cabinets dont have enough backhaul and i KNOW im not special most of my friends use netflix and kids love youtube and to them youtube is their netflix.

    The cvc is to expensive so congestion at the cvc combined with congestion at the nodes. AWESOME !!

    So to tl;dr what im saying is that the government is so out of touch not understanding that between middle aged users on netflix and high bandwidth usage gaming (im also a gamer) and kids smashing free game downloads, big mods and youtubing like crazy means the nbn is screwed before its finished.

  • Friday at 9:52 am
    K1LL3M

    http://www.smh.com.au/business/media-and-marketing/consumers-want-accc-to-monitor-broadband-speeds-industry-doesnt-20160915-grh1xa.html

    I think every comment I can make about this has been covered here already by better minds than mine.

  • Shane Eliiott

    RockyMarciano writes...

    Everything is fine, nothing is wrong with your internet *waves hand*

    I can't access the article just as well anyway.
    But I guess this is the great "quality control" that our internet is getting.
    Consumers are getting shafted on piss poor quality internet access for the money.
    Its bloody obscene.

  • Phg

    RockyMarciano writes...

    http://www.theaustralian.com.au/business/technology/telcos-reject-need-for-broadband-speed-test/news-story/f4136ffbb5d8c578229ee8665898ad21

    Instead, telcos and industry groups have suggested the introduction of guidelines designed to inform customers about the sort of service they can expect.

    According to the industry, customers by and large need to calibrate their expectations when it comes to fixed broadband speeds and there is enough competition in the market for them to switch providers if they are dissatisfied by a service.

    The rest of this article is a must read, with selected quotes from TPG, Optus and Telstra.

    Customers need to understand that they are getting up to speeds from all NBN Services.
    That there are no minimum speeds guaranteed
    Just maximum speeds guaranteed on each speed tier or speed boost pack.

    That switching providers when you are under a 2 year contract has early termination $ penalty clauses?

    That the competition alternatives may offer little material difference to overcome speed issues.

    That some of the speed issues are nothing to do with the RSP and that changing to any competitors might not make any difference.

  • Friday at 9:57 am
    MrMac

    Reports coming in that Stephen Conroy has resigned from senate for retirement.

  • Friday at 9:57 am
    MrMac

    Blackpaw writes...

    Peak hour gaming and streaming around 7pm onwards

    Gaming is very low in terms of bandwidth requirements, and also would not be a high representation of 200 connections on a node. Even with streaming, you won't get high numbers of people streaming concurrently or at same high levels of quality.

  • Friday at 10:00 am
    RockyMarciano

    MrMac writes...

    Reports coming in that Stephen Conroy has resigned from senate for retirement.

    Edit: I think i'll remove my official comment until official sources come in :)

    edit #2 -

    http://www.theaustralian.com.au/national-affairs/stephen-conroy-quits-parliament/news-story/c4f7c62d22a43cdd27d37f132f172184

    I guess the new NBN senate committee will not be able to put NBN under pressure now that Conroy has gone.
    Nobody else really knows the network like him.

  • Friday at 10:00 am
    Tandem TrainRider

    cej writes...

    Well your post had a lot of thought given to it

    Thanks for the kind words.

    MrMac writes...

    I'm not sure if this is as big an issue today as it is made out to be. Internet behaviour pattern's are fairly broad, even during a level of peak usage, and also constrained by limitations of FTTN as well

    I agree with this. In the short term it is more an issue of perception than reality. Why would an RSP "adequately" provision sufficient CVC when if they did, there is every chance their users will suffer congestion on the nbn� side anyway?

    My understanding is the differential cost of installing 10gbps vs 1gbps up front is a couple of hundred dollars at most. No more than $10mil across the entire FTTN build. But retrofitting we're talking a truck roll, the new equipment, possibly splicing fibres and almost certainly end user downtime and hence project management costs, liaising with RSPs etc. It'll be thousands, perhaps more. And even then it won't be nation wide, so it will limit nbn�'s (or more likely their new owner's) ability to offer more competitive (with wireless) price plans.

    My main point was this will more likely be an issue in a post 2020 world, where FTTN fixed line will be competing with wireless on capacity rather than performance (ie it will be used to offload secondary traffic away from your cell phone to keep within your data limit). I think 10gbps will extend the economic life of the nodes by a good 2 years (I'm sure plenty will still be in use a decade beyond that FWIW), and hence raise nbn�'s resale value.

  • Shane Eliiott

    MrMac writes...

    Reports coming in that Stephen Conroy has resigned from senate for retirement.

    I guess now NBNco is now full up with yes men now.
    Well at least we all know what direction the NBNco is going now at full speed.

    Is down....

  • MrMac

    RockyMarciano writes...

    Edit: I think i'll remove my official comment until official sources come in :)

    Apparently he announced he was leaving in senate last night, also on hansard, and it seems no one noticed...

    Edit: tabled his farewall speech, not announced it

  • Tandem TrainRider

    MrMac writes...

    Reports coming in that Stephen Conroy has resigned from senate for retirement.

    Someone must have found his resignation letter on the APH mail server.

  • sardonicus

    MrMac writes...

    Edit: tabled his farewall speech, not announced it

    But what will the shills do now? Their lifelong missionary zeal to cure Conrovia isn't needed any more. So we have bored anti fibre zealots. They remind me of 19th century Samurai in japan who picked fights out of boredom.

    To every shill. The conrovia is over! Give it up! Your mission given to you by the Gods of Murdock is over.

  • Friday at 10:24 am
    Deadly Chicken

    MrMac writes...

    Capacity wise, it's unlikely that a node will be full loaded with 384 users

    to be fair, the best node is a loaded node, FTTN is really only a viable technology in high density areas, e.g.. places where there are 384 premises close by,

    My guess is that people in CBDs and nearby will be on fairly loaded nodes, while people further out will be on less .loaded nodes.
    Its a bit of a shame really because the likely high tier users will be the businesses in the CBD

    Then it's extremely unlikely that all connections will be fully utilized at the same time

    well frankly they cant get even close to that on a fully loaded node, a fully loaded node doesn't need the connections to be fully utilised, most businesses use the internet at the same time, between 8am and 6pm. Most residential users use the internet at the same time, between 4pm and 12am.

    Netflix release entire seasons, and people binge watch. This has already been evidenced with Netflix when it was introduced in Australia. events occur online at certain times, and at those times people want to use their bandwidth at the same time.

    Before they changed to ASAP, the last date we were given for completion was 2020 right ? right in time for the next Olympics, Something that a LOT of Australians watched at the same time right ... Tokyo are recording it in 8k. But we wont be watching it at that will we.to be fair we probably wont be able to even stream HD consistently.

    People DO use the internet at the same times, its how our lives are structured, its why we have always had peak hour congestion. and the FTTN implementation has done nothing to address that, the 2Gbps designed capacity from each node is certainly part of that issue.

  • Friday at 10:24 am
    Frank Buijk

    Breaking news, Stephen Conroy resigned.

    http://www.smh.com.au/federal-politics/political-news/labor-powerbroker-stephen-conroy-resigns-from-the-senate-just-months-after-july-2-election-20160916-grhmby.html

    "When you resent being in Canberra because you are missing your daughter's soccer training it is time to retire from the federal Parliament.'

  • Friday at 10:40 am
    RockyMarciano

    Yup tis official.
    Guess he had enough

  • Friday at 10:40 am
    jakeyg
  • Friday at 10:49 am
    Dazed and Confused.

    Deadly Chicken writes...

    Good idea but ..
    1) I am pretty sure that they run 4 fibres, 2 active to provide 2 Gbps and 2 spare for future growth or upgrades (micronodes)

    it is 1 fibre for download and 1 fibre for upload, it is only a 1Gbps circuit

    so if the enable the second pair that will permit the node to have 2Gbps capacity.

    some Telcos do like to talk about combined download and upload as it can make the numbers sound better but it is misleading for those actually using he system

  • Friday at 10:49 am
    Visentinel

    Was conroy for or against fttp?

  • Frank Buijk

    RockyMarciano writes...

    Guess he had enough
    That is fair to say.

  • Shane Eliiott

    Visentinel writes...

    Was conroy for or against fttp?

    For.

  • Friday at 10:51 am
    Deadly Chicken

    fair play to him, who would want to have their name associated with this network, he has done what he can.

    He can see that the future is set with respect to communications in this country, why not get out, he has been in long enough to earn one of those perpetual pensions. If he is smart he will get on the board of Telstra next and screw nbn from the other side ;/

  • Friday at 10:51 am
    Shane Eliiott

    RockyMarciano writes...

    Guess he had enough

    Don't blame him really.
    LNP coalition is hellbent pushing their fraud something has got to give.

  • Friday at 10:52 am
    Frank Buijk

    MrMac writes...

    Apparently he announced he was leaving in senate last night, also on hansard, and it seems no one noticed...

    Edit: tabled his farewall speech, not announced it
    Says enough in my view. Even his party didn't realise.

  • Friday at 10:52 am
    Frank Buijk

    Shane Eliiott writes...

    Is down....
    Apparently they are going to adopt, Coles slogan.

  • Friday at 10:52 am
    K1LL3M

    Deadly Chicken writes...

    Before they changed to ASAP, the last date we were given for completion was 2020 right ? right in time for the next Olympics, Something that a LOT of Australians watched at the same time right ... Tokyo are recording it in 8k. But we wont be watching it at that will we.to be fair we probably wont be able to even stream HD consistently.

    To be, umm...fair though. Channel 7 will most likely have all the rights stitched up for that, So streaming wont be available anyway.

    Wouldn't want you accessing content any other way than theirs

  • Friday at 10:52 am
    dJOS

    RockyMarciano writes...

    Guess he had enough

    He's not the only one...... :-(

  • Friday at 10:54 am
    Frank Buijk
    this post was edited

    RockyMarciano writes...

    Nobody else really knows the network like him.
    Why do U think I wrote that it depends on the skills and knowledge of the 10 non government members?

    My educated guess, Conroy didn't like the proposal of the Government in regards to the Committee. He is a good Senator and party member so he will claim that it is time for the family. The real reason will come out soon. Just a matter of time.

    I think that some politicians get uncomfortable with the developing cosy relationship between the two biggest parties. The developments are an exact copy of what occurred in Europe in many countries. The threat of populist independents brings the biggest parties closer. The desire to stay on the plouche makes that they compromise to much, effectively increasing the opposite of what they wish to achieve, a larger flow to independents.

    For the scrutiny of the MTM-policy and NBN Co that is not a good one. As this is a compromise area. Stephen Conroy does not fit into that. And the situation in regards to the submarines in his new portfolio is a same story but worse as the joint interest (Pyne's retain of the seat, Labor's jobs) makes the biggest political parties almost partners.

  • Friday at 10:54 am
    jakeyg

    Frank Buijk writes...

    I think that some politicians get uncomfortable with the developing cosy relationship between the two biggest parties.

    exactly, and all you have to do is look at the backflip labor have just done on higher ed cuts ARENA (renewables) and the census. its a time when we need people to fight for whats right and not just cave into vested interests like the FTTN garbage that is being foisted upon us by a biased media, which is where i really lay the blame. Good work Conroy and thanks for battling so hard!

  • Friday at 11:14 am
    jakeyg

    .@abcnews has been to Senator Conroy's Melbourne office. Staff didn't know anything the retirement announcement #auspol

    says a lot....

  • Friday at 11:14 am
    jakeyg
  • Friday at 11:15 am
    Frank Buijk

    Proof is delivered faster than fibre.

    Could I take this opportunity to thank and congratulate Senator Cormann for his constructive approach to resolving some of the difficult issues. Both sides were involved in a little bit of give and take but the approach taken by Senator Cormann speaks volumes for him. As it is very late, I seek leave to table the rest of my contribution so we can move on.
    Political he played it as a gentlemen but personally he felt differently. Why otherwise the connect and resign in such manner.

  • Friday at 11:15 am
    Frank Buijk
    this post was edited

    I thought that I had a rather interesting response to a Twitter message of Jason Clare in which he aimed at Pauline Hanson on Islamic immigrants. It was not so much about what Jason or Pauline said on the issue, it was what Jason expected from Pauline.

    He portrayed that Pauline should talk to the AFP Commissioner as she was not helping them fighting terrorism.

    I was not so interested in that discussion, my approach was entirely different as I asked him why rely on the creditability of the AFP Commissioner when he in fact has shown no creditability or accountability to the NBN AFP Raids. I stated that NBN Co, the AFP and politicians all have creditability issues and I stated that they should take ownership of that problem rather than attacking the cross bench.

    Not sure where the two biggest parties want to go with this, but I don't think it is going to work in the eyes of the electorate. Not for NBN Co and its policies, and not for any other problem at hand.

  • Friday at 11:18 am
    RockyMarciano

    Wonder if conroy wasnt offered a seat on the new nbn senate along with the raids on his office. You can only push shit up a hill for so long before it takes its toll

  • Friday at 11:18 am
    Frank Buijk

    RockyMarciano writes...

    You can only push shit up a hill for so long before it takes its toll
    My point and do you want to do this when you know that you have to face even more government members with butter on their heads. I rather would spend time with my daughter too.

  • Javelyn

    nvm

  • Tim
    this post was edited

    Deadly Chicken writes...

    Good idea but ..
    1) I am pretty sure that they run 4 fibres, 2 active to provide 2 Gbps and 2 spare for future growth or upgrades (micronodes)
    still pathetic with 384 potential users per node

    As noted elsewhere, correct but misleading � it's 1Gbps downstream, 1Gbps upstream, and 2 spare but unterminated. You don't need many people to win NodeLotto to max that out during peak hour � 10-20 premises within ~500m of the node. This is a hard cap on how much CVC RSPs will be willing to purchase, even if CVC becomes really cheap.

    but if your point was more about the switching ability then ...

    2) I'm not so sure Malcom would agree with that, that basically requires refitting the nodes with 10 Gbps capable switching ... to 70,000 nodes, and then replacing the switching at the POIs. The difference in pricing between 1 Gbps switching and 10 Gbps switching at a retail level is in the order of 10 times its going to significantly impact costs. Hence it hasn't been done from the outset, because CapEx is supposed to be important to this mob.

    As I understand it, the nodes already have a 40Gbps backplane and can support 10Gbps optical modules � it's just the optical modules that have been installed that are limited to 1Gbps. Compared to the cost of the node, it's trivial (~$800/node from what I've read).

    And I'd be truly stunned if the POIs don't have sufficient switching capability considering the backhaul they're connected to (although it is possible that for the node side they've cheaped out).

  • Friday at 11:54 am
    sardonicus

    So now we have Rod Simms of ACCC saying [ as good as] that print newspapers are so moribund that they can do what the hell they like with mergers; the real dance floor is online media anyway, he says.

    Well, that's great Rod. Very happy to see that you value the online world so much. What about dealing with Fraudband while you are at it?

  • Friday at 11:54 am
    RockyMarciano
  • Helpmann ?
    this post was edited

    Tim writes...

    As noted elsewhere, correct but misleading � it's 1Gbps downstream, 1Gbps upstream, and 2 spare but unterminated. You don't need many people to win NodeLotto to max that out during peak hour � 10-20 premises within ~500m of the node. This is a hard cap on how much CVC RSPs will be willing to purchase, even if CVC becomes really cheap.

    http://blog.jxeeno.com/poor-nbn-fttnb-design-may-lead-to-decades-of-congestion/

    Lets hope that all got fixed in some new node upgrade...
    A rush to upgrade each new node :)

  • Javelyn

    Stephen Conroy .... Father of the NBN.

    Malcolm Turnbull .... Mother$#@&*! of the NBN.

  • Leopard

    Helpmann ? writes...

    http://blog.jxeeno.com/poor-nbn-fttnb-design-may-lead-to-decades-of-congestion/

    even if nbn� decides to upgrade the network, they will likely continue using copper-based technologies for the years ahead to avoid large capital costs again"

    Here's the big reason I get annoyed about anyone supporting FTTN � the 100% waste of money that could have been spent rolling out fibre � which everyone admits is the end game.

  • ltn8317g

    Conroy's announcement was sudden and unexpected. I was hearing him on Newsradio Parliament during the afternoon, and he used up all his allotted time before the Speaker told him his time has expired, and Conroy said, "I haven't even gotten started", or something similar. There was no hint of him exiting then and he sounded fully engaged. Yet within a few hours he announced he was chucking it in.

  • dJOS
  • Morby

    Tim writes...

    As noted elsewhere, correct but misleading � it's 1Gbps downstream, 1Gbps upstream, and 2 spare but unterminated. You don't need many people to win NodeLotto to max that out during peak hour � 10-20 premises within ~500m of the node. This is a hard cap on how much CVC RSPs will be willing to purchase, even if CVC becomes really cheap.

    The uplink ports are pluggable optics and could be poplulated with full duplex on single fibre SFPs. So the initial fibre deployment would seem to be capped at 4Gbps full-duplex. 7 or 8Gbps full-duplex if more fibre is pulled in or some tens of Gbps with a controller board upgrade to support 10G uplinks.

    As I understand it, the nodes already have a 40Gbps backplane and can support 10Gbps optical modules � it's just the optical modules that have been installed that are limited to 1Gbps. Compared to the cost of the node, it's trivial (~$800/node from what I've read).

    And I'd be truly stunned if the POIs don't have sufficient switching capability considering the backhaul they're connected to (although it is possible that for the node side they've cheaped out).

    You may be right, but my understanding is that 10G uplinks requires a fabric upgrade.

    Still, the design docs state that, while the node *could* be used to support 374 subscribers, the design goal is for ~200 subscribers per node. Furthermore, the design philosophy seems to be to start with minimum config and upgrade as CVC is bought. In my experience this is the most efficient way to do it *assuming* that you have the processes and procedures to upgrade capacity in a timely manner. There are many issues with FTTN, but I think it is safe to say that node congestion, aside from unexpected ramps, will not turn out to be one of them. Contention ratios can be kept within best practice right up to 200 subscribers with 50/20 even without fabric upgrades or added fibre. The problems will be with sync rates and CVC congestion � and the CVC congestion problem is not confined to FTTN.

  • Friday at 1:19 pm
    dJOS

    Morby writes...

    You may be right, but my understanding is that 10G uplinks requires a fabric upgrade

    Part of the problem is the nodes connect back to the FAN and the FAN only has redundant 10/10 gbps fibre links back to the POI.

    This makes upgrading nodes to 10 gbps expensive!

  • Friday at 1:19 pm
    EmbarkingToday

    Morby writes...

    Still, the design docs state that, while the node *could* be used to support 374 subscribers, the design goal is for ~200 subscribers per node.

    Hmm its certainly a topic of concern on the face of it.

    Although if the ISPs are averaging 1 mbps over their subscriber base at the moment during peak time then perhaps over 200-300 subscribers you won't have much problem with 1gbps nodes at the moment.

  • Friday at 1:24 pm
    Deadly Chicken

    Morby writes...

    Contention ratios can be kept within best practice right up to 200 subscribers with 50/20

    The 2 fibres are aggregated, so its up/down afaik.

    2000Mbps / 200 = (I know its tricky maths here) .... 10Mbps each

    that's still under both the minimum AND the coexistence minimum. So assuming omse uploading as well, then it comes down again.

    I don't get why people don't think this is an issue.

  • Friday at 1:24 pm
    Blackpaw

    It makes it impossible to supply 1:1 contention business plans.

  • Friday at 3:32 pm
    Mr FatPat

    Blackpaw writes...

    It makes it impossible to supply 1:1 contention business plans

    It makes it a clusterflap!

  • Friday at 3:32 pm
    Nick

    Morby writes...

    There are many issues with FTTN, but I think it is safe to say that node congestion, aside from unexpected ramps, will not turn out to be one of them.

    +1

    14.3(b) of this document still applies:
    http://www.nbnco.com.au/content/dam/nbnco2/documents/sfaa-wba2-product-catalogue-service-levels-schedule_20160901.pdf

    The problems will be with sync rates and CVC congestion � and the CVC congestion problem is not confined to FTTN.

    Precisely.

  • Friday at 4:13 pm
    Nick

    Deadly Chicken writes...

    I don't get why people don't think this is an issue.

    I don't get why people think this is an issue.

  • Friday at 4:13 pm
    Deadly Chicken

    Netflix have a new splash screen for Australia

    http://users.on.net/~deadlychicken/Images/nbnspeed.jxr

  • Friday at 4:14 pm
    Deadly Chicken

    Nick writes...

    I don't get why people think this is an issue.

    because they have provisioned a service that cannot achieve their minimum guarantees

    Just saying
    "There wont be an issue, trust me'
    does not hold up against the cold hard facts.

  • Friday at 4:14 pm
    Javelyn
  • Friday at 4:14 pm
    RockyMarciano

    I see Steve Baxter has come out of the woodwork and showing his true colours on twitter.
    Replies to anyone who comments "ever built a fibre network?!?" "Here's a link to my article!"
    https://www.linkedin.com/pulse/innovation-really-counts-stephen-baxter

    Where Steve can only make valid points on the single argument he brings up in his article.
    "If the goal is �to have fast internet� then we are missing the bigger picture"

    No.
    NBNs goal is deliver Australia's first national wholesale-only, open access broadband network to all Australians.

    Not deliver a private fibre network to a handful of people.

  • Friday at 4:14 pm
    ltn8317g

    Can anyone say whether the special fibre that is laid on to politician's electorate offices or to schools, in areas that have not had NBN fibre rolled out, is NBN or are business plans?

    My reason for asking is that if they are business plans, not only do the politicians' electoral offices have fibre ahead of anyone else, they have it without all that contention trouble that NBN fibre users have to live with.

  • Queeg 500

    ltn8317g writes...

    Can anyone say whether the special fibre that is laid on to politician's electorate offices or to schools, in areas that have not had NBN fibre rolled out, is NBN or are business plans?

    It's Telstra fibre.
    http://www.smh.com.au/federal-politics/political-news/ultrafast-deal-for-all-federal-mps-20130219-2epm3.html

    Edit: the quote is hilarious � Telstra thought MTM was such a good idea that they wanted to get rid of it, until Mal came along and wanted to pay them billions...

    A DPS spokeswoman said it was Telstra's idea to upgrade electorate offices from a mixture of copper, satellite and cable to fibre-optic cable.

    ''Having a fibre-optic infrastructure supporting the connectivity to each electorate office allows the bandwidth or network speeds to increase without being limited by the cabling infrastructure,'' the spokeswoman said.

  • redfield2

    RockyMarciano writes...

    I see Steve Baxter has come out of the woodwork and showing his true colours on twitter.
    Replies to anyone who comments "ever built a fibre network?!?" "Here's a link to my article!"

    This article has actually been mentioned several times already, and was also linked to on Delimiter. It was posted by Steve in April. He does make a lot of good points though, especially in regards to speed tiers. They need to go. Sure, the MTM (specifically FTTN, aka "Nodelotto") makes it difficult to ensure that everyone could get the same speeds, but it's better than paying for a 100/40 plan, and only getting something like 65/27, which doesn't make dropping down the to 50/20 plan quite worthwhile, but paying for a speed you can't achieve is even less so.

  • Friday at 4:26 pm
    U T C

    redfield2 writes...

    especially in regards to speed tiers. They need to go. Sure, the MTM (specifically FTTN,

    We dont have them on ADSL2+, so why bring them back with FTTN?

  • Friday at 4:26 pm
    redfield2

    Exactly...

  • Friday at 4:27 pm
    aliali

    MrMac writes...

    Then it's extremely unlikely that all connections will be fully utilized at the same time. Consumer behaviour varies across the timescale with different activities with varying bandwidth requirements, and varying bandwidth capacity at the premise.

    Tandem TrainRider writes...

    I agree with this
    I don't. If all the above varies so much then congestion on any network would not be as prevalent and common as it currently is. There is always huge bandwidth demand increases around the time kids get home from school and after dinner when people sit down to browse the net, play games and watch streaming video of some sort.
    Due to school and work hours for the majority of the population this is not going to change any time soon.

  • Friday at 4:27 pm
    Deadly Chicken

    redfield2 writes...

    but it's better than paying for a 100/40 plan, and only getting something like 65/27, which doesn't make dropping down the to 50/20 plan quite worthwhile, but paying for a speed you can't achieve is even less so

    perhaps we can all install a small raspberry pi tpe computer to constantly monitor our bandwidth and at the end of the month we can average it out and pay "up to $100(or whatever the price of the plan is)"

    if you only achieve an average of 60/25 on your 100/40 plan you only pay 61% of the 100 dollars a month you are supposed to pay for the 100/40 plan

  • Phg

    Deadly Chicken writes...

    pay "up to $100(or whatever the price of the plan is)"

    Up to 100/40 Up to $100pm
    Up to 50/20 Up to $50pm
    Up to 50/10 Up to $40pm (useful for HFC where upload is likely prone to more congestion)
    Up to 25/5 Up to $25pm
    Up to 12/1 Up to $12.50pm

    That seems much fairer.

  • U T C

    Phg writes...

    Up to 100/40 Up to $100pm
    Up to 50/20 Up to $50pm
    Up to 50/10 Up to $40pm (useful for HFC where upload is likely prone to more congestion)
    Up to 25/5 Up to $25pm
    Up to 12/1 Up to $12.50pm

    That seems much fairer.
    Up to 100/40 Up to $100pm
    Up to 50/20 Up to $50pm
    Up to 25/5 Up to $25pm

  • Phg

    U T C writes...

    Up to 25/5 Up to $25pm

    Good idea to scrap the up to 12/1 Speed Tier.

  • dJOS

    Deadly Chicken writes...

    The 2 fibres are aggregated, so its up/down afaik.

    Correct, one fibre in, one out.

    Deadly Chicken writes...

    I don't get why people don't think this is an issue

    Cause simple maths is beyond their intellectual capacity.

    Blackpaw writes...

    It makes it impossible to supply 1:1 contention business plans

    Correct.

  • Friday at 4:36 pm
    gazzaw48

    I�m a long time lurker of this thread (read every page), and have come to the realisation that there is a lot of valuable information in this thread that the general public is unaware of.
    Instead of just elevating our blood pressure on Whingepool, we as a community should attempt to educate the general public on the deficiencies of the MTM.
    Why don't some of our more knowledgeable posters collaborate and put together a fact sheet to send to and educate the new NBN Joint Standing Committee members? (or even every member of Parliament?)
    Spell out how NZ can do FTTP for nearly a third of the cost per premises figures given by NBN.
    Explain why FTTN is a dead end street and effectively a waste of taxpayers money.
    Detail how a node is bandwidth limited to 2Gbps shared between up to 384 users, compared to FTTP (currently 1Gbps, but more easily upgradeable to 10Gbps and beyond to 43000Gbps) fibre shared between only 32 users.
    Include speed charts showing how FTTN connection speeds drop off markedly after a couple of hundred metres. etc, etc, etc ��.
    Send it to all the newspapers, spoon feed the journos a story where the research has already been done for them.
    Send it to the ABC to be fact checked. Maybe 4 corners might be interested in doing a story on it.
    Start a petition on Get-Up.
    If we as a community can get the truth out there we may be able get public opinion on our side, as lost votes for LNP is the only way to halt this FTTN madness.

  • Friday at 4:36 pm
    dJOS

    Javelyn writes...

    Thank you djos. I don't recall seeing that one. Very apt

    It does a great job of exposing the stupidity of MtM.

  • Friday at 5:57 pm
    FibreFuture

    Queeg 500 writes...

    ''Having a fibre-optic infrastructure supporting the connectivity to each electorate office allows the bandwidth or network speeds to increase without being limited by the cabling infrastructure,'' the spokeswoman said.

    Ridiculous. Really they don't get to know what it's like for other nearby businesses and company's to be stuck on copper trying to do the same things (I.e Video conferencing)

    I don't know how to put this but i'll do my best � Because most politicians couldn't tell the difference between copper and Fibre when it comes to internet connections most of not all(?) will say you'll be able to do Video conferencing just fine on your connection. But we can't as the connection is poor and the speed / bandwidth isn't able to keep up with the application.

    Phg writes...

    Good idea to scrap the up to 12/1 Speed Tier.

    +1 for this, (and I hate to say it) but if anything goes wrong with Skymuster then it would be good to have 12/1 as a back up but 25/5 should be the minimum speed (At least with they way things are with FTTN being here and what not)

  • Friday at 5:57 pm
    hat92

    redfield2 writes...

    especially in regards to speed tiers. They need to go.

    That will simply show how unequal the NBN is between the various technologies as some simply cannot support high speeds.

  • Friday at 5:58 pm
    Majorfoley

    Frank Buijk writes...

    Breaking news, Stephen Conroy resigned.

    And there goes any hope that the new committiee will scrutinize this flapping mess.

  • Friday at 5:58 pm
    texmex

    Visentinel writes...

    the government is so out of touch not understanding that between middle aged users on netflix and high bandwidth usage gaming (im also a gamer) and kids smashing free game downloads, big mods and youtubing like crazy means the nbn is screwed before its finished.

    That sums up just what it looks like. But there may be a bit more to it, if we look at some of the people, and the detail, behind the facade of endless PR spin.

    The person responsible for aborting NBN and imposing the dire MTM was described by a colleague as 'Having practically invented the Internet.'

    A most unlikely claim; but we must assume he would, or should, have known FTTP-based NBN was the only way our future needs could be met. Despite this, he wilfully went ahead and killed off NBN on the flimsiest political rationale.

    Adding insult to injury, they still assert only 'gamers, gamblers and pron freaks' would use/need NBN capabilities over the rest of this century � an assertion so stupid it answers itself.

  • Friday at 6:04 pm
    Phg

    Steven Conroy's future contributions to shaping the Federal Coalition NBN/MTM policy.
    Take your pick.

    (a) Board member of NBNCo
    (b) Board member of Telstra
    (c.) Director of a Frank Buijc owned entity
    (d) Whirlpool NBN thread troll-slayer
    (e) Sky News Live Political Commentator

  • Friday at 6:04 pm
    texmex

    Phg writes...

    (a) Board member of NBNCo

    But, but � Malcolm only appoints the right people to his charades organisations! :-P

  • Friday at 6:19 pm
    FibreFuture

    texmex writes...

    flimsiest political rationale.

    Politics comes first. Wants and needs comes last.

    Adding insult to injury, they still assert only 'gamers, gamblers and pron freaks' would use/need NBN capabilities over the rest of this century

    Agreed, they are stubborn and blind. Look we have told them too much that it isn't just for streaming but having the ability to work from home for instance and access your content faster without having to get the sh*ts waiting and go elsewhere. If FTTH had been kept imagine what Australia would be like for good now?

    Work from home � Depending on what the job is you'll would of been working from home and that means fewer vehicles on the road because everyone isn't in a rush to get to and from work. Working from home means that you wouldn't have to leave your home to go to work and you would be in your own space without having to put up with your workers for the day.

    (Okay entertainment factor here but hear me on this) You want a movie but don't want to head to the movie store or the supermarket. Guess what? You can stream it without leaving the comfort of your home so you won't have to get in a car. head to the shops and come back just for the movie. Just pick up the TV remote, get comfy on the couch, choose a streaming app of your choice and pay for membership and find the movie and your good to go.

    Work becomes more efficient? Ah this is a good one, being faster means work will be done faster right? Perhaps and probably so. Seeing that upload meter go from 42:31 to something around 2:30 (2 mins, 30 seconds) means you'll get your work uploaded quicker and won't have to pace around the PC every x amount of minuets to check on the upload time. Guess what? Thanks to that quicker upload speed you'll have more time to meet the deadline if your client or yourself doesn't like something and wants changers. Compared to older technology where it's back to 42 minuets:31 seconds all over again just to fix a simple change. There won't also be much uploading happening overnight either so you won't have to leave your PC on to upload files overnight anymore which means your power costs will be reduced by a bit.

  • Friday at 6:19 pm
    hat92

    Visentinel writes...

    what im saying is that the government is so out of touch not understanding that between middle aged users on netflix and high bandwidth usage gaming (im also a gamer) and kids smashing free game downloads, big mods and youtubing like crazy means the nbn is screwed before its finished.

    Those are all pleasure things.

    I can not recall any person complaining about the NBN satellite where the Labor satellites they ordered are so small in capacity that the users on it can only dream of what other on fttn can do. Well a few complained, but they were quickly told where to go.

  • Friday at 6:38 pm
    FibreFuture

    hat92 writes...

    I can not recall any person complaining about the NBN satellite

    Just remember Mate. Turnbull Wanted those satellites scrapped too. So he's just as bad.

    http://www.smh.com.au/it-pro/government-it/the-satellite-malcolm-turnbull-never-wanted-prepares-for-liftoff-20150825-gj7t3j.html

    They (The people on them) can thank themselves lucky that their SAT wasn't scrapped in the end. if Mal had the dummy he's way he would of cut and scrapped them without fuss.

  • Friday at 6:38 pm
    Frank Buijk

    Phg writes...

    (c.) Director of a Frank Buijc owned entity
    LOL, CVs can be sent for the time being to our head office. It is for sale, too much maintenance. Only 25m euro. First owner Fritz Philips. Yes, from the globes. And whatever you do, don't forget to watch the video. :P

  • Friday at 6:42 pm
    texmex

    hat92 writes...

    I can not recall any person complaining about the NBN satellite

    Perhaps you have a somewhat limited, or selective, memory on that topic.

    From opposition, Malcolm Turnbull complained endlessly, and inaccurately, about every aspect of the NBN Co satellite program. It was a different story once he was minister, when he was fond of talking about the coming nbn� sats as if they had been all his own idea.

  • Friday at 6:42 pm
    Javelyn

    If the HFC is a ClusterFlap what term will they use for nbn�'s (mis)management of the sub-sub-contracting arrangements for satellite dish installations.

    http://www.zdnet.com/article/nbn-satellite-service-installation-process-an-absolute-bugbear-rsp/

    In news just to hand .......... dit,dit, d, dit, dit ...... apparently Bill Morrow has put through an order for kilometres of more new copper to be purchased to enable each home owner's satellite dish to be connected directly to Sky Muster. Initially nbn� will be trialling just one outback station home for this new Copper from the Satellite Dish to the Satellite (CftSDttS).

    It is rumoured that Senator Conroy goy wind of this through a leak from nbn� yesterday, threw his hands up in disgust and said "That's the last straw .... I'm resigning!"

  • Friday at 6:43 pm
    Javelyn

    Frank Buijk writes...

    And whatever you do, don't forget to watch the video. :P

    Watch the video! You're kidding. The front page took 45 seconds to load. I'd be buffering all night trying to watch a video from that site!

  • Friday at 6:43 pm
    Morby

    Deadly Chicken writes...

    The 2 fibres are aggregated, so its up/down afaik.

    That makes sense. If it was me I'd certainly be installing up/down optics day 1.

    2000Mbps / 200 = (I know its tricky maths here) .... 10Mbps each

    that's still under both the minimum AND the coexistence minimum. So assuming omse uploading as well, then it comes down again.

    I don't get why people don't think this is an issue.

    Because it is not an issue. If every one of those 200 users had purchased the 50/20 tier then that would give you a 5:1 peak contention ratio which is actually *good*. Gold plated even for residential broadband. This is not going to be the bottleneck. Now if it was 20:1 then I'd be more concerned....

  • Friday at 6:48 pm
    Deadly Chicken

    Morby writes...

    Because it is not an issue. If every one of those 200 users had purchased the 50/20 tier

    and just 40 of them tried to use it at the same time, then the network would be congested.

    hat92 writes...

    I can not recall any person complaining about the NBN satellite where the Labor satellites they ordered are so small in capacity

    the satellites were supposed to handle a frasction of the traffic that has already been dumped onto them

  • Friday at 6:48 pm
    Queeg 500

    hat92 writes...

    I can not recall any person complaining about the NBN satellite where the Labor satellites they ordered are so small in capacity that the users on it can only dream of what other on fttn can do.

    What you seem to be missing are the facts that Turnbull opposed the building of the satellites at all, that he is pushing extra premises from the fixed line footprint to the satellite footprint increasing the load, and that it was nbn� under Turnbull who set the FUP, not NBNCo under Labor.

  • Friday at 6:53 pm
    Morby

    Deadly Chicken writes...

    and just 40 of them tried to use it at the same time, then the network would be congested.

    And sure, if that happened on any kind of a regular basis, you would have a problem. But it never does. Access networks are always designed with contention. Just as the roads are not designed to carry every vehicle that is registered at the same time.

  • Friday at 6:53 pm
    Frank Buijk

    Javelyn writes...

    Watch the video! You're kidding. The front page took 45 seconds to load. I'd be buffering all night trying to watch a video from that site!
    Yeah, I suppose it is made for proper broadband speeds commonly found in innovative and agile countries.

  • Friday at 6:58 pm
    Dazed and Confused.

    Javelyn writes...

    If the HFC is a ClusterFlap what term will they use for nbn�'s (mis)management of the sub-sub-contracting arrangements for satellite dish installations.

    but Skymuster seems to have created lots of call centre spots in RSPs
    jobs and growth

  • Friday at 6:58 pm
    RockyMarciano

    http://www.totaltele.com/view.aspx?ID=494978

    Total telecom pick up on conroys exit

  • Friday at 9:55 pm
    jwbam

    MrMac writes...

    Reports coming in that Stephen Conroy has resigned from senate for retirement

    :( When he first started out, he was cluelessly going to put a "filter" on internet against tech advice � this changed as he took on the role of promoting the mostly FTTP version of NBN. And he became more WP aware.

    Miss him already.

  • Friday at 9:55 pm
    sardonicus

    jwbam writes...

    Miss him already.

    If he reads this, thanks for the fibre to the premises internet box that is in this room. Has never dropped out once. Have done downloads and uploads with it in a few months that I never did in 10 years of ADSL. Australia will get fibre to the premises internet as a common thing. The first fleet gendarmes didn't want the convict populace to get anything. They opposed copper phone lines in about 1910. They opposed sewered homes. They opposed Medibank. They oppose anything for the people Downton Abbey style. But in the end FTTP will still happen.

  • Friday at 11:05 pm
    KernelPanic

    FibreFuture writes...

    Because most politicians couldn't tell the difference between copper and Fibre when it comes to internet connections most of not all(?) will say you'll be able to do Video conferencing just fine on your connection.

    However, the really ironic part is that all politicians have Fibre to their offices because copper doesn't cut it for their needs.

  • Friday at 11:05 pm
    Mazdafan

    sardonicus writes...

    Australia will get fibre to the premises internet as a common thing.

    But we may get it much later than most countries.

  • Friday at 11:42 pm
    Charliedontserf

    We can test that message.

    (And yes we can test the bits vs bytes nomenclature)

  • Friday at 11:42 pm
    Charliedontserf

    Deadly Chicken writes...

    To use it, not to build i

    That pays for it

  • Charliedontserf

    Deadly Chicken writes...

    To use it, not to build i

    That pays for it

    Majorfoley writes...

    Just another thought you know 25mbps does not mean 25MBps right?

    stay posted :)

  • Charliedontserf

    jwbam writes...

    so do users that order a 100Mbps instead of a 12 or 25Mbps one ...

    Yep. This is a problem.

  • Yesterday at 12:06 am
    Manatoba

    http://www.smh.com.au/federal-politics/political-news/labor-powerbroker-stephen-conroy-resigns-from-the-senate-just-months-after-july-2-election-20160916-grhmby.html

    If only there was a way to stream high-quality video to a remote device, he'd have got to see his daughter's soccer-playing...

  • Yesterday at 12:06 am
    Majorfoley

    sardonicus writes...

    But in the end FTTP will still happen

    I want it to happen in my lifetime where i can actaully use it for something and not for an hour when i get home before i feel like i should sleep lol

  • Yesterday at 12:13 am
    exinterlinkuser

    Morby writes...

    And sure, if that happened on any kind of a regular basis, you would have a problem. But it never does. Access networks are always designed with contention. Just as the roads are not designed to carry every vehicle that is registered at the same time.

    Well, those on congested services would disagree with "But it never does".

    Optical fibre to the premises is a game-changer because of its data carrying capacity. Dedicated bandwidth e.g. for live streaming (and no-one has mentioned multi-cast over NBN lately) wouldn't require more fibres in the access networks of FTTP areas, just something better than the current pricing arrangements.

  • Yesterday at 12:13 am
    RockyMarciano

    Not NBN directly but it relates to how BT in the UK deal with cabinets that reach capacity, which I guess will eventually happen to NBN nodes -

    http://www.ispreview.co.uk/index.php/2016/09/openreach-bt-handles-full-capacity-fttc-broadband-cabinets.html

    Also NBN love to spout lab copper results, I see they didn't post this on their "blog" about fibre lab results -

    https://fossbytes.com/nokia-reaches-1-terabitsec-speed-its-time-to-forget-google-fiber/

    They must have accidently missed it :)

  • Yesterday at 12:17 am
    Better Presented

    Charliedontserf writes...

    That pays for it

    Connecting the dots with high-speed NBN users yet?

  • Yesterday at 12:17 am
    Blackpaw

    Majorfoley writes...

    Just another thought you know 25mbps does not mean 25MBps right?

    Wish there was a clearer convention, MB vs mb is easily confused.

  • Yesterday at 12:19 am
    Javelyn

    Blackpaw writes...

    Wish there was a clearer convention, MB vs mb is easily confused.

    Why would there be any confusion between mbps and MBps? S/

  • Yesterday at 12:19 am
    MrMac

    Javelyn writes...

    Why would there be any confusion between mbps and MBps? S/

    Technically it's Mbps and MBps. I like the confusion, helps separate out the people with knowledge on tech. Makes it easy to ignore articles when they mix it up

  • Yesterday at 12:54 am
    Javelyn

    MrMac writes...

    I like the confusion, helps separate out the people with knowledge on tech.

    Ahhhh ..... technical snobbery. ;) You're probably a prolific user of TLAs in conversation I presume.

  • Yesterday at 12:54 am
    Javelyn

    http://www.canberratimes.com.au/federal-politics/political-news/senator-stephen-conroy-the-labor-rights-man-of-political-intrigue-20160916-grhsia.html

    Amusing and ironic to see this article plastered with ads on the side that state

    Find out more > nbn� bring it on

    And the author of the article can't do better than raise rubbish about 'legends'.

    According to political legend, Conroy � unable to pin down then prime minister Rudd to an office appointment � arranged to travel with Rudd on a VIP flight in early 2009. High in the air, he and Rudd are said to have mapped out an early iteration of the NBN on the back of a paper napkin.

    But don't let facts get in the way of a MSM article.
    https://delimiter.com.au/2013/01/17/fact-check-the-nbn-wasnt-a-media-stunt/

    s/ What an esteemed journalist Tony Wright proves himself to be! s/

  • Yesterday at 2:41 am
    Artstar

    Javelyn writes...

    Ahhhh ..... technical snobbery. ;) You're probably a prolific user of TLAs in conversation I presume.

    Well, if one is going to talk tech, may as well get it right so that people understand the metrics being discussed. An argument about MB as opposed to an argument about Mb would each have different outcomes in the one context.

  • Yesterday at 2:41 am
    Javelyn

    Artstar writes...

    Well, if one is going to talk tech, may as well get it right so that people understand the metrics being discussed.

    Ahhh I think you miss my point. Who could disagree with accuracy. I completely agree that we get things right so that people understand the issue being discussed. A common sense position on your part.

    I was addressing the comment in the post that I like the confusion, helps separate out the people with knowledge on tech.

    How does the promotion of confusion assist people's understanding of issues?

  • Yesterday at 12:30 pm
    Mazdafan

    Is Malcolm Turnbull going to make G.Fast and XG.Fast work over this copper infrastructure?

    http://delimiter.com.au/2012/05/01/worst-of-the-worst-photos-of-australias-copper-network/

    1 Gbps speed?

  • Yesterday at 12:30 pm
    CMOTDibbler

    Javelyn writes...

    But don't let facts get in the way of a MSM article.

    Facts (as I remember them):

    • 2005/6 Telstra offered to build FTTN but the conditions attached were so appalling the government could not agree.
    • 2006 the G9 perpetrated the massive con that they could build FTTN without paying Telstra to acquire the copper
    • 2007 both the Coalition and Labor fell for the G9 con and started RFPs for companies other than Telstra to bid to build FTTN. RFPs that were bound to fail.
    • 2009 Labor woke up to reality and realised it was FTTP or nothing but didn't follow any known process to determine how to build it. The Coalition was in 'oppose everything' mode so it all became 'political'.
    • 2013 Turnbull said he "wouldn't start from here". No one asked him where in that history he would have started and what he would have done. We know what he did when he did "start from here".

    Close?

    Why did the G9 get off so lightly for all the damage and delays they caused?
    Why did Labor do a RFP for a $4.7bn project but not for a $30.4bn project?
    Why did the Coalition let Turnbull try to implement his crazy policy?

  • Yesterday at 12:46 pm
    Morby

    exinterlinkuser writes...

    Well, those on congested services would disagree with "But it never does".

    Optical fibre to the premises is a game-changer because of its data carrying capacity. Dedicated bandwidth e.g. for live streaming (and no-one has mentioned multi-cast over NBN lately) wouldn't require more fibres in the access networks of FTTP areas, just something better than the current pricing arrangements.

    Well, never is a long time. There will always be the potential incidents like the Victoria's Secret launch that cause a spike. However, no carrier ever dimensions for those spikes. If they did, the service would be unaffordable. A 5:1 contention ratio in the node is still a pretty gold-plated contention ratio.

    In this particular scenario, fibre/copper makes no difference. The contention ratio for nodes is identical to that for much of the FTTH network. And it doesn't even come into play because the CVC contention ratios are significantly higher. 2011 design docs allow up to 50:1 contention ratio for domestic broadband services and 10:1 for business services, which, even allowing for the bundling advantage of a larger number customers/POI than /node, will completely swamp node congestion. Congestion will show up in the POI long before it shows up in the node.

  • Yesterday at 12:46 pm
    Queeg 500

    CMOTDibbler writes...

    2007 both the Coalition and Labor fell for the G9 con and started RFPs for companies other than Telstra to bid to build FTTN.

    No, Telstra could have submitted a bid to the RFP � they chose not to.

    2009 Labor woke up to reality and realised it was FTTP or nothing but didn't follow any known process to determine how to build it.

    No, it was the expert panel assessing the RFP responses that said it should be FTTP or nothing, and there was ample analysis of how to build it (including but not limited to the implementation study).

    Why did the G9 get off so lightly for all the damage and delays they caused?

    Because nothing like that happened.

    Why did Labor do a RFP for a $4.7bn project but not for a $30.4bn project?

    Because the outcome of the RFP process is what lead to the NBN project.

    Why did the Coalition let Turnbull try to implement his crazy policy?

    Because it was Coalition policy.

  • Yesterday at 1:03 pm
    Queeg 500

    Morby writes...

    A 5:1 contention ratio in the node is still a pretty gold-plated contention ratio.

    There is no such 5:1 contention ratio in the node.

    Congestion will show up in the POI long before it shows up in the node.

    How do you know this? Do you imagine that RSPs will have geographic monopolies?

  • Yesterday at 1:03 pm
    Morby

    CMOTDibbler writes...

    Close?

    Why did the G9 get off so lightly for all the damage and delays they caused?
    Why did Labor do a RFP for a $4.7bn project but not for a $30.4bn project?
    Why did the Coalition let Turnbull try to implement his crazy policy?

    Pretty close. I would add interstitially:

    After the 2005/6 and RFP debacles, it became apparent to Conroy that the only way to solve the problem was complete structural separation, which is a hard call. If you follow the logic through:

    Structural separation ---> compulsory
    compulsory ---> It has to be free to the consumer or it won't get up
    Free to the consumer -----> very expensive whichever way you do it.
    very expensive ---> means you have to have a "great leap forward" or it won't get up
    "great leap forward" ------> all-fibre network.

    So the political logic forced the proposal of a "big bang" fibring up of the nation paid for entirely out of tax revenues which is actually economic insanity. But the same logic has also been followed (rather better, arguably) in New Zealand. If it isn't politically possible, then it isn't possible however much people whinge on Whirlpool or spread memes on Facebook.

    So we were sold a pony or perhaps even a unicorn. So far props to Conroy, because he got a big and necessary (but politically difficult) project up. But the problem was that the price and delivery timescale for the pony were horrendously underestimated initially. Whether this was part of the political selling process or due to bad advice being given to the minister, we may never know. My suspicion is a bit of both. There seems to be an element of assuming that greenfield and brownfield FTTP come at a similar cost. And maybe they would if an aerial fibre approach were politically feasible. But under a buried fibre approach they are not. (Maybe FTTdp and skinny fibre can fix that somewhat?).

    BUT once the pony has been sold and the contract signed, you can start to chop off its legs and argue that it is the same pony. Politically, you can only do this early in a term, which is what happened when Labor lost power. Enter the MTM. A technically somewhat inferior but economically far more palatable solution which has the added advantage of achieving full structural separation which is what the exercise has been about all along significantly sooner.

    Looking at the latest rollout numbers, it seems to me that NBNco is on track to achieve structural separation by the required date. Now political advantage can be gained by actually putting legs back on the pony. Hopefully we will see some of that. I am expecting to see currently FTTN areas slated for FTTdp. For more sparsely-settled areas like outer suburbs it should even be cheaper than FTTN.

  • Yesterday at 1:05 pm
    User 9905

    Charliedontserf writes...

    We can test that message.

    (And yes we can test the bits vs bytes nomenclature)

    You're a writer, a communicator, who specializes in technology, especially internet technology, yet somehow you have no idea how to reply (I assume you are replying and it's not some random brain infarction) to someone (I assume) pages ago (because I can't see what this post relates to), and have it make sense. How can you be an expert writing technology and the internet yet seemingly have the abilities of complete novice when it comes to using it?

  • Yesterday at 1:05 pm
    Terror_Blade

    Blackpaw writes...

    Wish there was a clearer convention, MB vs mb is easily confused.

    There is, because people don't know/use it doesn't mean there isn't one.

    Upper case "B" means BYTES, a lower case "b" means BITS.
    Upper case "M" prefix means MEGA (million), a lower case "m" prefix means MILLI (1/1000th)

    In the telecoms industry speed is rated in "bits per second" no matter how large a number it is, that's the convention, it is never rated in "bytes per second" so it is always "bps" and as they are talking about sending thousands, millions, billions etc of bits, it is always an upper case prefix such as Mbps for mega bits per second.

    So saying 25 mbps you are saying 25 milli bits per second (or 25 thousandths of a bit per second) which is 1 billion times less than 25 Mbps (25 million bits per second) or if you say 25MBps you are actually saying 200 Mbps (since a byte is equal to 8 bits).

    Just because people don't know there is a difference or don't use it cos they've always seen an application refer to a "file transfer" in speeds of MBps (since files are measured in bytes not bits applications would typically measure the transfer speed of the file in bytes per second) so then use that same convention when they talk about a communications link does not mean that there is not a clear convention, just that it isn't being used.

  • Yesterday at 1:07 pm
    Morby

    Queeg 500 writes...

    How do you know this? Do you imagine that RSPs will have geographic monopolies?

    30 years designing access and core networks and some time spent researching in the field of teletraffic engineering.

    Not to mention just reading the design documents and the specs on the equipment being used.

  • Yesterday at 1:07 pm
    Dazed and Confused.

    ruffaz writes...

    The guy finally tells me that FTTN cant be upgraded to any higher than 25Mbps.

    Telstra telling people that 25/5 Mbps is all they will sell on FTTN
    whrl.pl/ReIv8y

    Guess that is another reason that people are only "choosing" 25/5 Mbps plans

  • Yesterday at 1:45 pm
    Queeg 500

    Morby writes...

    So the political logic forced the proposal of a "big bang" fibring up of the nation paid for entirely out of tax revenues which is actually economic insanity.

    You seem to be ignoring anything that doesn't suit your interpretation of events, not least the fact that it was the independent expert panel who recommended FTTP.

    A technically somewhat inferior but economically far more palatable solution

    It isn't, as the explosion in cost since the 2013 election has proven.

    full structural separation which is what the exercise has been about all along

    Where did you get that idea from?

    significantly sooner.

    Yeah, by the end of their first term in government, right?

    Looking at the latest rollout numbers, it seems to me that NBNco is on track to achieve structural separation by the required date.

    How? By travelling back in time?

  • Yesterday at 1:45 pm
    Majorfoley

    Slightly off topic did they change editing rules? I can't edit previous post from few days ago

  • Queeg 500

    Morby writes...

    Not to mention just reading the design documents and the specs on the equipment being used.

    What design documents and specs suggest that RSP usage across a POI will be identical to overall usage on a single node?

  • Morby

    Dazed and Confused. writes...

    Telstra telling people that 25/5 Mbps is all they will sell on FTTN
    whrl.pl/ReIv8y

    Guess that is another reason that people are only "choosing" 25/5 Mbps plans

    So much of this bullshit going on.

    May parents live out in the country and are about 4km from the exchange. Unfortunately, they have a pairgain in their copper loop because back in 2001 when they built the house they ordered/were sold an ISDN connection.

    Ever since ADSL came to town, they were told they could not have ADSL because of the pairgain. (which incidentally is no longer necessary because the ISDN service was discontinued years ago). So of course they have had to put up with a 3G mobile broadband connection with a 16GB/month cap for ferocious dollars.

    In July, Optus put up a 4Gplus tower in town and some pretty decent home wireless broadband plans along with it. Lo and behold Telstra phones them up and says they can have ADSL with a 50GB cap for a more reasonable charge as long as they sign up to a 24-month plan. Did I mention that an NBN fixed wireless tower will go up 5km from them in direct line of sight next Feb?

    I wasn't there in time to say "don't sign that Mum!", so now they are locked into Telstra for 24 months on a 1.2Mbps DSL connection. Yes, they can upgrade to NBN when it comes, but only with Telstra of course now. GRRRR.

    Ironically, they are happy as clams because 1.2Mbps is fast enough for what they do and the 16GB cap was the problem, not the speed.

  • Yesterday at 2:08 pm
    Javelyn

    Majorfoley writes...

    Slightly off topic did they change editing rules? I can't edit previous post from few days ago

    Have a read through this thread from here (whrl.pl/ReIqBJ) and/or maybe post your query there.

  • Yesterday at 2:08 pm
    Majorfoley

    Javelyn writes...

    Have a read through this thread from here (whrl.pl/ReIqBJ) and/or maybe post your query there.

    Thanks

  • Javelyn

    Morby writes...

    Lo and behold Telstra phones them up and says they can have ADSL with a 50GB cap for a more reasonable charge as long as they sign up to a 24-month plan. Did I mention that an NBN fixed wireless tower will go up 5km from them in direct line of sight next Feb?

    Are you suggesting that Telstra are using unscrupulous practices to lock in customers to long term contracts with their organisation before the NBN is rolled out in the area. Wash your mouth out with a copper sulphate solution!

  • Morby

    Queeg 500 writes...

    What design documents and specs suggest that RSP usage across a POI will be identical to overall usage on a single node?

    Statistics will give you a probability of any particular node being any given quantum "out of whack". Decades of experience tells us that a 5:1 contention ratio in the access and aggregation layer is perfectly fine. Most xDSL networks run considerably hotter.

    Design documents going back to 2011 specify a maximum CVC/AVC contention ratio of 50:1 for residential services and 10:1 for business services. That completely swamps the node contention ratio � i.e. the node contention ratio does not contribute to congestion at these levels. This has been borne out in the FTTN deployments to date. And there are processes and procedures in place to upgrade any nodes (there will be a few) that run hotter than expected.

  • Yesterday at 2:18 pm
    Morby

    Javelyn writes...

    Are you suggesting that Telstra are using unscrupulous practices to lock in customers to long term contracts with their organisation before the NBN is rolled out in the area?

    Hell no.

  • Yesterday at 2:18 pm
    K1LL3M

    Morby writes...

    Because it is not an issue. If every one of those 200 users had purchased the 50/20 tier then that would give you a 5:1 peak contention ratio which is actually *good*. Gold plated even for residential broadband. This is not going to be the bottleneck. Now if it was 20:1 then I'd be more concerned....

    There is comments from Paul Rees within the Skymesh thread that this IS and issue. NBNco can have congestion on theirs side

    Here is just one reference to that possibility whrl.pl/ReIvDO

    Paul Rees writes...

    You want some assurance that an upgrade will included more bandwidth? Yes, I can give you that assurance, however if the congestion is on nbn co's network between your home and the Penrith POI, then that's not something that we can fix.

    This is clearly can or does exist

  • Yesterday at 3:03 pm
    Queeg 500

    Morby writes...

    Statistics will give you a probability of any particular node being any given quantum "out of whack".

    What multi-provider network (with a mix of "budget" and "premium" providers) have you analysed the statistics of?

    Decades of experience tells us that a 5:1 contention ratio in the access and aggregation layer is perfectly fine.

    What 5:1 contention ratio are you referring to? These nodes are up to 38.4:1.

    Design documents going back to 2011 specify a maximum CVC/AVC contention ratio of 50:1 for residential services and 10:1 for business services.

    Please cite this.

    And there are processes and procedures in place to upgrade any nodes (there will be a few) that run hotter than expected.

    I'm sure the same was true for Telstra street cabinets also...

  • Yesterday at 3:03 pm
    CMOTDibbler

    Majorfoley writes...

    Slightly off topic did they change editing rules? I can't edit previous post from few days ago

    Cick on 'Reply to this post'. Go to the URL at the top of the screen and change "reply&r" to "edit&e". You can now edit the post.

  • Yesterday at 3:29 pm
    Morby

    Queeg 500 writes...

    What 5:1 contention ratio are you referring to? These nodes are up to 38.4:1.

    No they ain't. With 200 subscribers (the design number) per node in day 1 configuration, if everyone orders the 50/20 tier then it is 5:1. In fact, it looks as if people can only get 25/5 which would make it 2.5:1 but it is dangerous to assume that because when you force subscribers down to a tier they don't want to be at, they naturally use more of that tier than they would if they were on the tier they wanted.

    Please cite this.

    How about you get on google and have a look for yourself? You are the one who seems to want to know. BTW RSPs who choose to have 50:1 CVC/AVC contention will be giving a very shitty service. But there seem to plenty out there doing it, or even worse.

  • Yesterday at 3:29 pm
    Queeg 500

    Morby writes...

    No they ain't.

    Yes, they absolutely are � potentially 384 "up to 100 megabits/sec" connections sharing 1000 megabits/sec backhaul.

    the design number is meaningless when they have to place the nodes based on the copper in the ground.

    How about you get on google and have a look for yourself?

    You made the claim � it is up to you to substantiate it.

  • Yesterday at 3:48 pm
    Dazed and Confused.

    Morby writes...

    With 200 subscribers (the design number) per node in day 1 configuration

    problem is that the design number is being taken as an average

    just take this ADA, day 1 design https://www.finder.com.au/nbn-tracker/rollout/2WOY-06

    whilst the average is 205 there is a great variation between individual nodes

    there are nodes in the 2Woy area that have over 300 connections

    this one https://www.finder.com.au/nbn-tracker/ada/2WOY-02-10 has 322

  • Yesterday at 3:48 pm
    Morby

    Queeg 500 writes...

    Yes, they absolutely are � potentially 384 "up to 100 megabits/sec" connections sharing 1000 megabits/sec backhaul.

    You can invent any fictitious scenario you like I guess. However, the design rules do state approximately 200 subscribers per node. I've seen reports of up to about 40 more or less, but in no case is 384 a "thing". Similarly, we'll never see a case within the next few years where every subscriber will order 100Mbps access. In fact, at the moment it seems you can't order it. See the other threads. In fact, the average tier is well less than 50/20, so the contention ratio is actually better than 5:1 in current deployments, regardless of what could possibly be the case in some armchair commentator's fevered imagination. To dimension according to reality seemed to be the best practice last time I looked.

    As to the 1vs2 Gbps backhaul, I haven't been privileged to look inside the nodes, but if you google yourself up a copy of the 2015 design rules, they say:

    Currently, 4 x Point to Point fibres will be provided for each DSLAM.
    Out of the 4 x Point to Point fibres, the equipment requires 2 x Uplink Fibres which are connected through to the Aggregation switch in the NBN Co Network. The additional 2 x Point to Point fibres are spares, to allow flexibility for future growth or migration activities.

    Then if you look at the picture below that, they show the link from the DSLAM to the AAS as being Nx1GE, N<=4. This suggests one by GE link per fibre using full-duplex over single-fibre optics. That limitation (N<=4) has to come from the fibre count, because the devices can support up to 8x1GE uplinks if enough fibre is available. Others on this forum who are closer to it than I have also said that the optics being used are single-fibre, full-duplex as well. It would be an insane waste of fibre not to.

    So it is a 2000Mbps uplink, not a 1000Mbps uplink. Upgradable to 4000Mbps by purchase of 4 SFPs and populating a couple of ports in the AAS.

    Whichever way you slice it, congestion will not be in the node and is highly unlikely to be in the AAS. It will be at the POI where AVC meets CVC. Greenfield FTTH TFANS actually have a higher potential contention ratio, but they won't be a congestion point either.

  • Yesterday at 3:53 pm
    Harry

    helhom writes...

    Even if you don't live in Greenwood the actions from petition will hopefully address the non-sensical roll-out of the NBN and if successful sets a precedence for the NBN.co to reconsider the roll-out primarily based on requirement and not on any other factors. Let me rather not start discussing what is my opinion on the current roll-out

    At least you have a date, Edgewater ("E" on my broadband) had a 3 Year Plan date of starting FTTN this quarter and at the last minute it was cancelled due "unforeseen delays with another project" and not only that they now have no date in mind.
    Don't know what's going on as I can see no technical or Engineering reason why it cannot go ahead as planned and there is even an NBN fibre leg from Ocean reef road 200 odd meters into the suburb. The area next to the Lake Joondalup/Yellalonga Park is ideal for rolling out fibre and the route to the Wangara POI (which is active) is 90% flat Yellalonga Park bushland and also easy to lay cable.
    I think what is happening they are cancelling Kingsley HFC and doing FTTN instead. Possibly the same for Woodvale which also has dissappeared from the3 year plan.
    Why they are rolling out current HFC and close to exchange suburbs first I have no idea and ignoring the SOE re poorly served we'll probablynever know but one way or another I bet its "political".

  • Yesterday at 3:53 pm
    Dazed and Confused.

    Morby writes...

    So it is a 2000Mbps uplink, not a 1000Mbps uplink.

    bull dust, 2 fibres are connected, they are in individual uplink and downlink fibres, the capacity is 1Gbps up and 1 Gbps down.
    They are not using them as 2 bi-directional fibres

  • Yesterday at 4:19 pm
    cw

    Morby writes...

    Then if you look at the picture below that, they show the link from the DSLAM to the AAS as being Nx1GE, N<=4. This suggests one by GE link per fibre using full-duplex over single-fibre optics.

    Except if you look at the photos of what is actually being built it clearly shows two fibres per SFP, I think the reality trumps NBN Co's laughably ambiguous drawing.

    Why would they do this? Because all they care about is building it the cheapest way possible, even if the difference was only a few hundred dollars out of a $250k+ node build per site.

    That limitation (N<=4) has to come from the fibre count, because the devices can support up to 8x1GE uplinks if enough fibre is available. Others on this forum who are closer to it than I have also said that the optics being used are single-fibre, full-duplex as well. It would be an insane waste of fibre not to.

    Sure if they deploy dual NT configured in Active/Active redundancy mode, which they are not. The larger nodes that might require the additional capacity have not spare slots in the chassis for the second NT.

    Having said that, it probably makes sense to switch to 10GE SFP anyway rather than add a second NT as the redundancy would most likely be wasted with the updated network design.

  • Yesterday at 4:19 pm
    cw

    Dazed and Confused. writes...

    They are not using them as 2 bi-directional fibres

    This is evidenced by the simple fact the two fibres are connected to a single SFP.

    The problem is people who have been involved in building networks before can't get their heads around how "cheap and nasty" NBN Co have gone with the MTM.

  • Yesterday at 5:02 pm
    Helpmann ?

    Some interesting comments about what could be done. The results a few HD ready devices per account will have on copper internet.

    Has much changed about the mentioned hard limit? The later upgrade fix?

    http://blog.jxeeno.com/poor-nbn-fttnb-design-may-lead-to-decades-of-congestion/

    https://delimiter.com.au/2016/02/15/nbn-blogger-predicted-fttn-congestion-seven-months-ago/

    https://delimiter.com.au/2016/02/09/nbn-gridlock-fttn-taken-down/

    New ideas about actual backhaul in use per node? What the equipment might support is great but what was installed?

    Thx.

  • Yesterday at 5:02 pm
    Morby

    Hmm, I find this surprising given the docs and common sense, but I'll take your word on it, at least until I can get a look inside a real production node for myself. I've been trying to find photos, but have yet to find one with the resolution to tell for sure.

  • Yesterday at 5:34 pm
    Helpmann ?

    Sales literature found online shows a set of options depending on what is requested.

    What is been done with the node network or what will the upgrade path per node be?

  • Yesterday at 5:34 pm
    Morby

    Helpmann ? writes...

    http://blog.jxeeno.com/poor-nbn-fttnb-design-may-lead-to-decades-of-congestion/

    https://delimiter.com.au/2016/02/15/nbn-blogger-predicted-fttn-congestion-seven-months-ago/

    https://delimiter.com.au/2016/02/09/nbn-gridlock-fttn-taken-down/

    The jxeeno blog is remarkably untouched by the ravages of knowledge about traffic engineering. (But it does say that the fibres are used in bidirectional mode � i.e. 2Gbps uplink on day 1.)

    The delimiter article was followed up later on the same page with another article saying the issue was resolved by the addition of CVC capacity. The congestion was not in the node, but the POI. RSP issue, not an access issue.

  • Yesterday at 5:44 pm
    Morby

    Helpmann ? writes...

    What is been done with the node network or what will the upgrade path per node be?

    My bet is that in 2019 one or both parties will come in with a platform to replace all FTTN nodes with some form of fibre service � either FTTdp or FTTH over maybe a 5-year period. They are toast long-term.

  • Yesterday at 5:44 pm
    Helpmann ?
    this post was edited

    So we like that 2Gbps uplink number? A better, newer number to suggest?

    So that 2Gbps uplink is shared with how many accounts on average to a round 50?
    200? 150? More than 200 expected on average? Some cities could see near a max count per node all using that 2Gbps uplink?

    Or has the thinking on the use of that 2Gbps uplink changed?

    Edit could be "1 Gbps up and 1 Gbps down". Thx whrl.pl/ReIyqD

  • Yesterday at 5:50 pm
    Morby

    Helpmann ? writes...

    So we like that 2Gbps uplink number? A better, newer number to suggest?

    I like 2Gbps, but it might in fact be only 1 Gbps on day 1. I am prepared to be disappointed.

    So that 2Gbps uplink is shared with how many accounts on average to a round 50?
    200? 150? More than 200 expected on average? Some cities could see near a max count per node all using that 2Gbps uplink?

    The design parameter coming out of NBNco is "approximately 200 premises per node". I have seen documentation of nodes with as high as 240. Maximum number of ports a node can support is 378 premises. But that doesn't mean there is any intention to max out the node. No doubt it will eventually happen somewhere.

    Or has the thinking on the use of that 2Gbps uplink changed?

    The jxeeno blog says 2Gbps. NBN doco that I have downloaded implies 2Gbps.

    I have seen posts in these forums from people whom I consider to generally know what they are talking about say both 1Gbps and 2Gbps. If you get the chance to look inside a real node see if you can see how many fibres are coming out of the uplink SFPs. :-)

  • Yesterday at 5:50 pm
    Terror_Blade

    Morby writes...

    The congestion was not in the node, but the POI. RSP issue, not an access issue.

    Of course it was, at that time FTTN had only just gone RFS so there hadn't been time for the Node to get populated for it to be the cause of congestion.

    Morby writes...

    My bet is that in 2019 one or both parties will come in with a platform to replace all FTTN nodes with some form of fibre service � either FTTdp or FTTH over maybe a 5-year period. They are toast long-term.

    With what money?

  • Yesterday at 5:53 pm
    Majorfoley

    Morby writes...

    My bet is that in 2019 one or both parties will come in with a platform to replace all FTTN nodes with some form of fibre service � either FTTdp or FTTH over maybe a 5-year period. They are toast long-term.

    Hmm no i don't see this happening. Despite them admitting its end game i can see the entire coalition denying any form of changing the NBN unless its to produce more nodes. I bet they'll change their tune coming around 2019 in order to get more voters and then do exactly what they did in 2013. Claim everything on contract and sites going wouldn't be changed and do exactly that.

  • Helpmann ?

    So we like the 2Gbps uplink number?

    Say around 200 accounts using what kind of upload and download at say 5pm till midnight on an average night?

    A few users with HD ready devices? Some accounts near the node and getting fast plans, some people been at a great distance and having to select slower plans.

    Anyone want to help out on the hard limits given some average usage numbers on an average existing node with that 2Gbps uplink?

  • helhom

    @Harry. Once you do a bit of digging you don't even belief the dates that are given. I feel for you guys. Do you get ADSL at the moment? Large chunks of Greenwood does not get ADSL. Those that get complain it is slow (less than 4mbps) and it regularly drops out. Some people can't even get mobile broadband in their home on their devices so they have to put external antennas up. Do you get the new Vividwireless LTE service or at least the old WiMAX service from them. Let me not start with that debacle seeing that this is an NBN thread. If you also can't make sense of the roll-out we should take them to task and the only way we will do it is if we stand together and pose the question(s) and demands through a forum they cannot ignore, hence the reason for the petition.

  • cw

    Morby writes...

    Hmm, I find this surprising given the docs and common sense, but I'll take your word on it, at least until I can get a look inside a real production node for myself. I've been trying to find photos, but have yet to find one with the resolution to tell for sure.

    Do you mean like this? :)

    https://drive.google.com/open?id=0ByD9XsDSP3e4QjM4ZzVFY0VsVVk

    PS: And yes, that is a NBN Co FTTN cabinet. The person that took the photo can choose whether they want to identify themselves though.

  • Dazed and Confused.

    cw writes...

    Do you mean like this? :)

    and as you can see, they have only installed ONE SFP module in the card, there are 3 vacant slots for SFP modules

  • Yesterday at 9:02 pm
    Phg

    Maybe the Federal Government wants NBNCo to go really cheap on FTTN, on the basis that whatever they build/spend on FTTN will be of little use when it comes to future needs. So that the cheaper and lower capacity the FTTN, the quicker we will get whatever comes after FTTN. Either from NBNCo or from the Private Sector.

  • Yesterday at 9:02 pm
    slam

    cw writes...

    Except if you look at the photos of what is actually being built it clearly shows two fibres per SFP, I think the reality trumps NBN Co's laughably ambiguous drawing.

    Why would they do this? Because all they care about is building it the cheapest way possible, even if the difference was only a few hundred dollars out of a $250k+ node build per site.

    Exactly, if you think about it from the NBN employees perspective. They called it operation clusterflap from within. If it comes from the top and they want it dirt cheap and shitty. The engineers at the bottom will deliberately design it with the bare minimum at the cheapest cost.

    When the original crew were building a nation building infrastructure project to get away from the Telstra monopoly they were enthusiastic. LNP comes along and flaps it up. Some of them still gota work there as it needs to bring money in to pay for bills. At that point it becomes do whatever, they don't care any more. If you want garbage we will give it to you, just make sure their wages are paid. No wonder NBN co/tm under LNP are running out of funds.

    If you think people were complaining that speeds can drop to dialup levels during peak hour, this is not an exaggeration, its hidden behind CVC. Most likely to get it this bad is the nodes 1gbps being saturated by 200 premises. Each taking 5mbps, which is not hard in a house hold with multiple members and multiple devices during peak times.

  • Manatoba

    Morby writes...

    Whichever way you slice it, congestion will not be in the node

    And yet NBN Co. admitted at the senate hearings that there could be congestion in the node cabinets, slowing customers' speeds.

  • jwbam

    Charliedontserf writes...

    Yep. This is a problem.

    first you say that customers should pay for what that use, then you say it's wrong to charge more for the better service?

    ???

    Oh I get it � you mean that everybody should pay for the laying of fibre to their place if they want to use it, and then get any speed they want all at the same price ...

    Like when they build a road or shopping centre or Telstra 4G tower they bill those people living in the area directly and then let them help themselves with not extra charges to the heavier users? ... Which doesn't actually happen in reality?

    You believe in keeping separate the capital costs of building from to cost of providing ongoing resources needed to provide the service? That just isn't always the case. It also doesn't make sense when the cost per user is much more expensive when rolling out to a single individual user at a time vs doing the whole neighbourhood at once.

  • Yesterday at 9:48 pm
    ACTfireman

    dgtek will release the future rollout places soon they told me this :

    South Canberra and Adelaide plans already submitted for the consideration

    the release is on commsday at 5 october :D

  • Yesterday at 9:48 pm
    jwbam

    Terror_Blade writes...

    In the telecoms industry speed is rated in "bits per second" no matter how large a number it is, that's the convention,

    it's the convention because Bytes only really are significant when you store the data in a format that allows you to access individual words or bytes. It's not really meaningful in telecommunications where the bits might never be stored or retrieved as bytes or words, as in when they are generated and read by codecs.

    It's like when they quote sales of crude oil in billions of barrels per year, but might say that a pump or pipe can move billions of litres an hour.

  • Harry

    helhom writes...

    if we stand together and pose the question(s) and demands through a forum they cannot ignore, hence the reason for the petition.

    WIth you on this and in fact a link to your petition has been put on out local community Facebook site. This site regularly gets complaints about our ADSL which is connected via a cable across Lake Joondalup to Wanneroo exchange , so the fastest anybody theoretically could get would be around 12 Mbs if they are near where the cable comes ashore. However most of the suburb gets around 4 Mb/sec max if they are lucky and a Telstra Tech told me a few years ago that the copper and joints are not exactly in good condition.
    Due to the hilly area, Vivid Wireless coverage is patchy both for the old one and the new 4G one. As an aside TV reception is also poor in some parts, it was highlighted by people complaining they could not get the Olympics on FTA and of course some idiots at CH7 said why not stream it instead over the internet !!! you can imagine the laughs that that got.
    I did a quick calculation that WA is entitled (based on Population) to around $3Billion of the Govt NBN spend I would be surprised if we have had anywhere near half of that yet. The Govt NBN money runs out in 2017 and what's the betting we get told it's tin cans and string for all of us not connected up yet.
    Its the GST share thing all over again.
    I am stirring things up with our local Fed Member and hopefully will be meeting with him before the end of this month, mainly to find out why Edgewater's NBN rollout has been delayed and why him and his WA colleagues aren't jumping up and down in the press and the Parliament demanding that the NBNCo , pull out their digits in Metro Perth.

  • helhom
    this post was edited

    Harry writes...

    I did a quick calculation that WA is entitled (based on Population) to around $3Billion of the Govt NBN spend I would be surprised if we have had anywhere near half of that yet.

    @Harry If you go to the NBN.co weekly report at:
    http://www.nbnco.com.au/content/dam/nbnco2/documents/nbn-rollout-metrics/nbn-rollout-metrics-080916.pdf
    Then you will notice that total Aus has had 3.11mil premises RFS of that WA has 318k premises RFS, that is just over 10.2% and not that far off from the ratio that WA makes of the Aus population.

    However where things get very interesting is of those numbers the entire Aus only has 1.31mil premises activated. That is a take-up of 42%. Why is that. There is something they are not telling us. What does NBN.co measure their progress on RFS or activated. I bet you its RFS.

    Now to get to WA, and we have only had 119,890 premises activated. So that makes only 9% of the activated services are in WA. I have been keeping an eye on this for a while now and it is getting worse. So uptake in WA, which we heard in the news is the worst state when it comes to speed and thus you would expect a high percentage of uptake when premises are activated but we see only 37%. These numbers are including the fixed wireless and satellite services numbers. You can do those with the brownfield and greenfield numbers only and the trend is the same.

    They do provide a service class zero (Column C) in the report which means there is additional cabling required. Now this is the number in the report I think is bollocks or if it is true then they have been dragging their feet to change the pole over to the node. I would be interested to see what the service class 10 (which is requiring additional cabling for FTTN) but that is not in the report.

    In summary. What do the NBN.co report their progress on, if it is RFS we are all in for a rude shock in the not to the distant future. Then NBN.co please explain why we have only around a 40% activation rate. Finally based on the line of questioning why would WA be slower than other states to take it up when it is one of the states with the worst internet speeds. Excuse my cynicism but is it maybe that you started the roll-out in areas where there is good ADSL coverage and people are locked into 24month contracts. Didn't do you market research properly then did you?

  • Yesterday at 9:57 pm
    helhom

    Harry writes...

    WIth you on this and in fact a link to your petition has been put on out local community Facebook site. T

    @ Harry. Thanks for that mate, can see the signatures coming through already and it's only been a few hours, looks like we've hit another nerve ending when it comes to NBN.

  • Yesterday at 9:57 pm
    Queeg 500

    Morby writes...

    You can invent any fictitious scenario you like I guess.

    It's not a fictitious scenario, it's a worst case scenario based on what is actually being installed in the real world.

    However, the design rules do state approximately 200 subscribers per node.

    Please quote this.

    I've seen reports of up to about 40 more or less, but in no case is 384 a "thing".

    The link has already been provided to one node covering 322 premises � here it is again in case you missed it https://www.finder.com.au/nbn-tracker/ada/2WOY-02-10 � and 384 lines is what the nodes are configured for from day one. Heaven forbid that some of those premises end up wanting more than one service...

    Similarly, we'll never see a case within the next few years where every subscriber will order 100Mbps access. In fact, at the moment it seems you can't order it.

    Wrong, plenty of RSPs offer up-to-100Mbps (not 100Mbps) FTTN services today.

    In fact, the average tier is well less than 50/20, so the contention ratio is actually better than 5:1 in current deployments

    Were you involved in the modelling for the farce that called itself a Cost Benefit Analysis?

    To dimension according to reality seemed to be the best practice last time I looked.

    Then why are you advocating dimensioning based on theoretical targets and random assumptions?

    It would be an insane waste of fibre not to.

    The whole thing is an insane waste.

    I haven't been privileged to look inside the nodes

    Plenty of people have, and have shown your statements to be incorrect.

    So it is a 2000Mbps uplink, not a 1000Mbps uplink.

    Only if you don't care what direction the data travels!

    Whichever way you slice it, congestion will not be in the node

    Maybe you think that if you keep saying it it will come true...

  • Yesterday at 10:18 pm
    helhom

    Does anyone know why the myBroadband.gov website has been semi-deactivated and one now gets redirected to a government data website. I see the data is still there but it is not as interactive as what it used to be in the myBroadband.gov website.

    In the myBroadband.gov website you could put your address in and it would spit out your broadband service availability rating and quality rating, based on which part of the exchange (read pole) you were a part of.

    Now in the data website if you don't know under which part if the exchange you are a part of then you are basically screwed. It's not a readily available bit of information. I have noticed at my pole the number is painted on it. But that could be co-incidence or just in my area, and for that you need to know where your pole is.

    Is it maybe because the data had too many errors in it that they pulled it. Just my cynic view, because it was clearly incorrect for my location. Said I had an A rating for ADSL availability and that when I can't even get ADSL. Too far away from the exchange and with Telstra's new policy of distance from the exchange it should have been pretty obvious to them. Maybe it jus considers is the copper in the ground (tick), is the exchange ADSL activated (tick), are there ports available in the exchange (tick).

    There are lots of ports available in the exchange because half of us can't get ADSL.

  • Yesterday at 10:18 pm
    Queeg 500

    Morby writes...

    My bet is that in 2019 one or both parties will come in with a platform to replace all FTTN nodes with some form of fibre service � either FTTdp or FTTH over maybe a 5-year period.

    That makes about as much sense as your suggestion that the node cabinets can be used for GPON.

  • Yesterday at 10:18 pm
    Majorfoley

    http://www.itwire.com/telecoms-and-nbn/74819-internet-speed-you-don-t-get-what-you-pay-for.html
    more on the the big teclo/ACCC something we heard about again a few days ago.

    http://www.itwire.com/broadband/74810-how-to-?get-connected?-broadband-resource-launched-by-accan.html
    Not 100% sure what to think of this one. Seems like a reason to just say "We can't provide ADSL but we can move you to a 3G/4G plan for much more of your money and less data."

  • Yesterday at 10:18 pm
    Geo101
    this post was edited

    Helpmann ? writes...

    Say around 200 accounts

    200 residential accounts or 200 corporate accounts?

    Helpman please realise business in (Australia) had fibre services (possibly) before you were born.

    Please take this into consideration before you post?

  • Yesterday at 10:23 pm
    Geo101

    Helpmann ? writes...

    Anyone want to help out on the hard limits given some average usage numbers on an average existing node with that 2Gbps uplink?

    Is that a scientific question or an economic one?

  • Yesterday at 10:23 pm
    Geo101

    Phg writes...

    Maybe the Federal Government wants NBNCo to go really cheap on FTTN

    Conspicuous theories aside, if you dump a DSLAM in a streetside cabinet, as of 2016, a 1G link appears to be adequate.

    If it wasn't, I'm 200% sure they would upgrade it.

    They pretty much come out of the factory like that.

    I didn't make the rules, its pretty much just they way the ship them.

  • Geo101
    this post was edited

    https://en.wikipedia.org/wiki/Teletraffic_engineering

    Come back to me if a 1G link is not adequate.

    (and not trolling).

    Layer 2 stuff...

    The crucial observation in traffic engineering is that in large systems the law of large numbers can be used to make the aggregate properties of a system over a long period of time much more predictable than the behaviour of individual parts of the system.

  • Manatoba

    https://networks.nokia.com/products/7330-isam-fttn-ansi

    Several mentions of "bonding" on the page... Oh, well... This is only Australia, it's not like we deserve anything gold-plated...

  • Geo101

    Manatoba writes...

    Oh, well... This is only Australia, it's not like we deserve anything gold-plated...

    People still missing the big picture.

    NBN have a "cosy" relationship with Nokia, Alcaltel, etc.

    It goes back a long way, way before NBN MK1.

    If you've any background, you'll have noticed that gear sitting in exchanges (well before MQ came on the scene) was from the same company.

    But, just because you can Google "bonding", doesn't mean we rush out and buy it.

    The NBN hasn't been a disaster because of equipment, it's been because of many other reasons.

    PS: I'm not knocking NBN MK1 BTW, but it's time to move on.

    Plenty of good gear to come yet. Mark my words.

  • Geo101
    this post was edited

    A question for the Whirlpool diehards to ponder?

    Have any of the POI routers switches taken a dive yet?

    6 years without missing a beat....

    Can't beat that?

    Never seen so many experts in national network implementation, particularly that nasty layer 2 one.

    Must be just a case of poping a switch somewhere and running some skinny fibre...

  • Geo101

    Queeg 500 writes...

    The whole thing is an insane waste.

    touch�, but I suspect your an NBN MK1 diehard?

  • Morby

    Dazed and Confused. writes...

    and as you can see, they have only installed ONE SFP module in the card, there are 3 vacant slots for SFP modules

    Yep. On that node it is pretty clear. Given the initial customer profile on nodes, it is enough I guess, but it does seem like a pretty small saving to me. Upgrade will have to come sooner.

  • Geo101

    Morby writes...

    On that node it is pretty clear

    Possibly I'm old school, but how does one monitor traffic by looking at a picture.

    I thought for a moment I had my old test gear out...

  • Manatoba

    Geo101 writes...

    But, just because you can Google "bonding", doesn't mean we rush out and buy it.

    I'm sorry, but you completely missed the point.

    The gear is especially designed with bonding in mind. It is especially heralded all over the specifications page/brochure. And the best speed only comes with bonding.

    But residential customers in Australia are not getting 2 pair bonding, and businesses are not getting 8 pair bonding.

    So, the "making best use of existing plant", and advertising top speeds when you are only going to use the gear to the lowest potential, all gets a little sour in the NBN case...

  • Deadly Chicken

    Geo101 writes...

    I suspect your an NBN MK1 diehard

    You make that sound negative, how about you phrase it more honestly .

    "I suspect your an advocate of a 93% FTTP network in the same time for less money than what we have"

  • Javelyn

    Deadly Chicken writes...

    You make that sound negative, how about you phrase it more honestly .

    "I suspect your an advocate of a 93% FTTP network in the same time for less money than what we have"

    Great response to a Negative Nelly DC. Geo is just spin, spin, spin.

  • Today at 6:48 am
    Tandem TrainRider

    Geo101 writes...

    PS: I'm not knocking NBN MK1 BTW, but it's time to move on.

    "On". Is that where we're heading?

  • Today at 6:48 am
    Steve78

    Plain and simple the RSP is over subscribing users and not keeping up with bring cvc on. This is happening because the sales or ordering system does not keep track of how Amy users are connect to each POP. I work closiley with a few RSP's and I have been told this. They are worried if they say do to the connecting user until cvc is added they would loss the busniess. This comes back to having to many POP in remote areas were backhaul is still very expensive a long with costly cvc charges from NBN. There is just too many POP involved and RSP's are too slow to react on traffic management. Once an issue is identified it just takes too long to start a project to upgrade it.
    Think about it. Your adding thousands of new users with know what carrier they are going to uses. This is also happen with fttp and was hopping a few years ago too.

  • Today at 6:52 am
    bythebrook

    helhom writes...

    Does anyone know why the myBroadband.gov website has been semi-deactivated and one now gets redirected to a government data website. I see the data is still there but it is not as interactive as what it used to be in the myBroadband.gov website.

    In the myBroadband.gov website you could put your address in and it would spit out your broadband service availability rating and quality rating, based on which part of the exchange (read pole) you were a part of.

    Now in the data website if you don't know under which part if the exchange you are a part of then you are basically screwed. It's not a readily available bit of information. I have noticed at my pole the number is painted on it. But that could be co-incidence or just in my area, and for that you need to know where your pole is.

    It's not loaded by default, but when you are looking at the National map, load the 'Broadband map' data set. You will probably also have to lower the opacity of the two other data sets. The area covered by each pillar has a black outline.

    Then click on your house on the map and the 'Feature Information' has the pillar name listed at the top.

    I agree with you that it doesn't show areas with poor access. There is a relatively new housing estate near me that has terrible broadband and the National map doesn't display that.

  • Today at 6:52 am
    Deadly Chicken

    Geo101 writes...

    https://en.wikipedia.org/wiki/Teletraffic_engineering

    Come back to me if a 1G link is not adequate.

    (and not trolling).

    Layer 2 stuff...

    The crucial observation in traffic engineering is that in large systems the law of large numbers can be used to make the aggregate properties of a system over a long period of time much more predictable than the behaviour of individual parts of the system

    why are you posting this ?

    when it clearly states, in the very wiki that you linked to

    In broadband networks[edit]

    Teletraffic Engineering is a well-understood discipline in the traditional voice network, where traffic patterns are established, growth rates can be predicted, and vast amounts of detailed historical data are available for analysis. However, in modern broadband networks, the teletraffic engineering methodologies used for voice networks are inappropriate

  • Terror_Blade
    this post was edited

    Geo101 writes...

    200 residential accounts or 200 corporate accounts?

    Helpman please realise business in (Australia) had fibre services (possibly) before you were born.

    Please take this into consideration before you post?

    Corporate business, but 98% of business is small business, 89% have less than 5 employees and 61% turn over less than 200K PA so you can be sure the vast majority of business in Australia won't have Fibre, today let alone before he was born.

    Geo101 writes...

    It goes back a long way, way before NBN MK1.

    The NBN company existed before it was created with NBN MK1?

    Geo101 writes...

    Have any of the POI routers switches taken a dive yet?

    Has anyone ever complained about the equipment in the POI or just whats being deployed for the last mile?

  • LoosestPing

    Geo101 writes...

    Come back to me if a 1G link is not adequate.

    Ok I'm back at you Geo. Apart from some obsolete junk what have got to offer? This is meant to last 20 + years, when it's obsolescent NOW. A 1Gbps link will introduce congestion at peak periods. It's ANOTHER bottleneck in nbn's long chain of bottlenecks that customers will have to deal with. You really think that nbn will pull another fibre to every node? When they don't even have the money now to complete their shoddy work? Pull the other one.

  • Today at 9:15 am
    Harry

    bythebrook writes...

    I agree with you that it doesn't show areas with poor access. There is a relatively new housing estate near me that has terrible broadband and the National map doesn't display that.

    There is this now as an alternate

    http://accan.org.au/broadband/get-connected/adsl-underserved

  • Today at 9:15 am
    Blackpaw

    Harry writes...

    There is this now as an alternate

    http://accan.org.au/broadband/get-connected/adsl-underserved

    Given the address lookup on it doesn't work I am not filled with optimism.

  • Today at 9:32 am
    helhom

    bythebrook writes...

    It's not loaded by default, but when you are looking at the National map, load the 'Broadband map' data set. You will probably also have to lower the opacity of the two other data sets. The area covered by each pillar has a black outline.

    Then click on your house on the map and the 'Feature Information' has the pillar name listed at the top.

    I agree with you that it doesn't show areas with poor access. There is a relatively new housing estate near me that has terrible broadband and the National map doesn't display that.

    @bythebrook. Thanks managed to do it but it took forever seeing that I don't have a high speed link and probably chewed a huge chunk of my data, whereas the myBroadband.gov website simply had you type in your address and it filtered all the unnecessary data. Still does not make it easy for people to find out what is for what.

    Do you know if there is an update of the data planned that is more accurate in terms of 2016 seeing that the dataset is based on 2013?

  • Today at 9:32 am
    Deadly Chicken

    https://soundcloud.com/720abcperth/the-nbn-is-it-delivering-what-was-promised

    Morrow claims FTTN will enhance Australia for 100 years, he also talks about the possibility of launching another satellite....

    so much cheaper/faster than FTTP :/

  • Today at 12:36 pm
    Blackpaw

    bythebrook writes...

    It's not loaded by default, but when you are looking at the National map, load the 'Broadband map' data set.

    I'm totally confused new the new layout � can't even find where to load the map.

  • Today at 12:36 pm
    Mazdafan

    LoosestPing writes...

    You really think that nbn will pull another fibre to every node? When they don't even have the money now to complete their shoddy work?

    I am getting seriously depressed reading this. What were they really thinking when they designed this FTTN network?

  • Today at 1:02 pm
    exinterlinkuser

    Morby writes...

    However, no carrier ever dimensions for those spikes. If they did, the service would be unaffordable. A 5:1 contention ratio in the node is still a pretty gold-plated contention ratio.

    These days, the providers need to take into account a significant percentage of people wanting to use streaming video (e.g. Netflix) in peak periods.

  • Today at 1:02 pm
    cw

    Geo101 writes...

    The crucial observation in traffic engineering is that in large systems the law of large numbers can be used to make the aggregate properties of a system over a long period of time much more predictable than the behaviour of individual parts of the system.

    What you and many fail to address is whether 200 is a sufficiently large number for this to apply.

    I have raised this time and again, I am yet to see an adequate response to the issue.

    It is pretty easy to wave our hands around and say that the same provisioning rules that apply when there are thousands , tensbof thousands or even more.

    If you want any clearer example of this look at Internides early experience in Tassie with 100Mbps services. This was at the CSA level which is a maximum of 4000 users not the 200.

    So yeah, it isn't as simple as you make out.

  • Today at 1:15 pm
    Helpmann ?

    Mazdafan writes...

    I am getting seriously depressed reading this. What were they really thinking when they designed this FTTN network?

    A technical solution to working with existing copper. The hard limit design policy.

    The policy of just placing a node over a voice grade copper network, bringing in power. What could be a 2Gbps uplink would work for redacted more years?

    100 accounts, 150, 250, near the max per node then get to test a few HD ready devices every night.
    Is it a provider side issue or do many new nodes need an another new upgrade to fix the 2Gbps uplink.

  • Today at 1:15 pm
    Deadly Chicken

    cw writes...

    What you and many fail to address is whether 200 is a sufficiently large number for this to apply

    or that the article he linked to explicitly stated

    "However, in modern broadband networks, the teletraffic engineering methodologies used for voice networks are inappropriate"

  • Today at 1:16 pm
    Dazed and Confused.

    Helpmann ? writes...

    fix the 2Gbps uplink

    they have only enabled 1 Gbps up and 1 Gbps down, the second fibre pair is not terminated, and they have not installed the second SFP module

  • Today at 1:16 pm
    Helpmann ?

    Dazed and Confused. writes...

    they have only enabled 1 Gbps up and 1 Gbps down, the second fibre pair is not terminated, and they have not installed the second SFP module

    Thanks for the correction :) That was interesting design policy.

  • Tim

    Morby writes...

    Hmm, I find this surprising given the docs and common sense

    Common sense and documentation appear to have nothing to do with nbnTM (and vice versa).

    The design parameter coming out of NBNco is "approximately 200 premises per node". I have seen documentation of nodes with as high as 240.

    The node I will be connected to is slated to have 223 premises connected.

    https://www.finder.com.au/nbn-tracker/ada/2MTT-01-02

    If you look at the ADA details in 2MTT-01 you will see 4 ADAs with >200 premises, including one of 280 (and one of 4, with the same provisioned uplink):

    https://www.finder.com.au/nbn-tracker/rollout/2MTT-01

    This is in an area that was scheduled to have FTTP construction commenced by end of 2014, with the expectation of being RFS by end of 2105, if Labor had retained in 2013. And my FTTN RFS date has changed from August to September to no longer published by nbnTM.

  • Blackpaw

    Deadly Chicken writes...

    or that the article he linked to explicitly stated

    "However, in modern broadband networks, the teletraffic engineering methodologies used for voice networks are inappropriate"

    To be fair, not really applicable as we aren't getting a modern broadband network :(

  • Today at 1:35 pm
    Leon

    Mazdafan writes...

    I am getting seriously depressed reading this. What were they really thinking when they designed this FTTN network?

    Labor = Fibre
    Labor = bad

    therefore

    Fibre = bad

  • Today at 1:35 pm
    Phg

    Mazdafan writes...

    What were they really thinking when they designed this FTTN network?

    That money sunk invested into FTTN is not worth it, as it will need to be overbuilt quite soon.
    In fact the less money spent on it now and the worse its performance, the quicker it will be overbuilt.
    Most importantly, the worse the FTTN, the lower the barriers to entry and the higher the returns for anyone wanting to overbuild it, providing that they do not own the FTTN as well.

    Setting up FTTN as very weak competitor.

    Nice in theory, but fraught with political, reputational and other risks. Particularly for both the National as a whole, and those who can't get what they need and want, until the what comes after FTTN arrives. A timeframe that is most uncertain.

  • Today at 1:40 pm
    Psydonk

    Deadly Chicken writes...

    Morrow claims FTTN will enhance Australia for 100 years, he also talks about the possibility of launching another satellite....

    I legitimately don't get how he can get away with blatantly lying, not only to the public, but private investors as well.
    Almost everything that comes out of his mouth is a bold faced lie. How can a public figure in charge of such an important infrastructure project not be held to account. It was like the last senate hearings, "Commercial in confidence" for everything even though barely any of it was classified under commercial in confidence (and doesn't Parliamentary Privilege overrule that anyway?), they just refused to give the required evidence and documentation to the inquiry, yet they just got away with it, every single time.

  • Today at 1:40 pm
    texmex

    jwbam writes...

    When he first started out, he was cluelessly going to put a "filter" on internet against tech advice � this changed as he took on the role of promoting the mostly FTTP version of NBN.

    It may have happened to change about the same time as he started promoting the FTTP-based NBN, but it's hard to see any connection. Imposition of government Net censorship is always a very bad idea; once such controls are in place, the capacity for scope creep in censored content is always irresistable.

    It took a while to get through, but once he realised his censorship dream was dead, he was then able to fully focus on the one great contribution he made � the peerless introduction of the vital FTTP NBN.

  • Today at 1:42 pm
    Geo101

    Helpmann ? writes...

    do many new nodes need an another new upgrade to fix the 2Gbps uplink

    Have a look at a TPG DSLAM which has been recently installed in a large MDU.

    One of those inner city type dwellings with lots of inner city type residents. You know, the 12 student to an apartment type ones.

    Get back to me with the stock standard link that TPG is using. And if they have any plans for upgrading that in the near future.

  • Today at 1:42 pm
    marty17

    Psydonk writes...

    I legitimately don't get how he can get away with blatantly lying, not only to the public, but private investors as well.

    At the moment he is pulling the wool over the public's eyes but not the private investors and this shall be evidenced when the Governments allocation is exhausted.

    No one with any respect for their money will want a bar of Turnbulls MTM.

  • Today at 1:46 pm
    texmex

    Javelyn writes...

    How does the promotion of confusion assist people's understanding of issues?

    He wasn't promoting confusion about NBN/MTM or anything else, he was merely making the point that we could all save ourselves some time by skipping past posts containing obvious errors.

    There's a subtle, but vital, difference between a post saying, for example, 'MTM is wonderful because of blah blah blah', and a post that says 'I don't understand xyz, could you explain this to me please'.
    ;-)

  • Today at 1:46 pm
    Geo101

    Manatoba writes...

    I'm sorry, but you completely missed the point.

    I'm sorry I didn't.

    Bonding is an option, like a line speed selection of 12/25/50/100 mbps.

    It's simply not being used. The stock standard line card supports other speeds, and other configurations.

    The copper network which is being utilised for theNBN has a spec of 90% for 50Mbps, without bonding, as bonding would assume that every area has spare pairs. That's simply not the case.

    It is especially heralded all over the specifications page/brochure.
    It's an option, just like using FW or satellite to deliver service where a stock standard DSL service wont meet the current government policy.

  • Today at 1:48 pm
    Geo101

    texmex writes...

    He wasn't promoting confusion

    Perhaps I should cite some real good stuff, but I think news and wiki articles will suffice in this thread.

    The reader can of course investigate deeper if they want to.

  • Today at 3:32 pm
    Jack.Daniels

    Phg writes...

    That money sunk invested into FTTN is not worth it, as it will need to be overbuilt quite soon.

    The overriding function of the FTTN design is to keep Turnbull's friends in profit. A functional NBN network, like was originally designed, would see Foxtel die and Telstra relegated to 'just another reseller carrier'. Obviously commercial 'deals' with the LNP has seen the current NBN drop to the levels that will see Foxtel profitable for at least another 10 years... and keep Telstra's various monopolies in place for the foreseeable future. This also keeps the LNP in play with favorable publicity from the murdoch press, and keeps their various share portfolios profitable.

  • Today at 3:32 pm
    Jack.Daniels

    Geo101 writes...

    The stock standard line card supports other speeds, and other configurations.

    The 'linecard' will support a single speed... it might be a 4x1G card (though it could have been a 1x10G if they'd spent the money), and bundling 4x1G interfaces is a possibility. The contention ratios seen when you have 384 subscribers (maybe 20% are expecting 100mbit/s, but all that is promised is 25mbit/s) sharing a 1gbit/s link is too high. Even if you bundle all 4 into a 4gbit/s link 384 Netflix subscribers are going to suffer, and the ACCC are going to hear about it... eventually. The NBN are currently stonewalling RSPs, telling them that their CVC purchase is to blame for their woes, and that their node backhaul is not oversubscribed. But that won't last forever.

  • Today at 3:38 pm
    Geo101

    Deadly Chicken writes...

    when it clearly states, in the very wiki that you linked to

    The field was created by the work of A. K. Erlang for circuit-switched networks but is applicable to packet-switched networks, as they both exhibit Markovian properties, and can hence be modeled by e.g. a Poisson arrival process.

    Perhaps you should update the article?

    Teletraffic science is the traditional term for all theoretical fundamentals and engineering practices to describe data flows in telecommunication networks, the performance of the usage of network resources, procedures for sizing of resources and engineering the networks for given traffic load and quality of service requirements.

    http://www.trc.adelaide.edu.au/trc/

  • Today at 3:38 pm
    CMOTDibbler

    Phg writes...

    Most importantly, the worse the FTTN, the lower the barriers to entry and the higher the returns for anyone wanting to overbuild it, providing that they do not own the FTTN as well.

    I think the legislation that requires any competing network to be wholesale only makes the business case very difficult.

    Setting up FTTN as very weak competitor.

    It's not just the technology, it's also the high access prices on the NBN/MTM.

  • Today at 3:41 pm
    texmex

    Leon writes...

    therefore
    Fibre = bad

    And of course: Any-old-lying-rubbish-the-plebs-can-be-made-to-swallow = Brilliant!

    We could write a book (if the Royal Commission doesn't get in first) on how Oz went from a first class, world leading NBN concept to a ragbag MTM that's being, or has been, scrapped elsewhere.

  • Today at 3:41 pm
    texmex

    Geo101 writes...

    Perhaps I should cite some real good stuff

    A change in appoach so as to incorporate some relevant and accurate info is always welcome indeed.

    Provided it really is 'real good stuff', of course.

  • Today at 3:43 pm
    Geo101

    Jack.Daniels writes...

    The 'linecard' will support a single speed...

    The linecard supports many speeds and configurations.

    The uplink is most commonly a 1G link, and has required (as per NBN network design rules) the Access Aggregation Switch's (AAS).

    Like I said, DSLAMS come stock standard from the factory with 1G links. There is a reason for that.

    Do you think NBN would be wasting money on aggregation switches if it was cheaper to provide 10G uplinks for each and every DSLAM nationwide?

  • Today at 3:43 pm
    Geo101

    duplicate

  • Today at 3:57 pm
    Javelyn

    Geo101 writes...

    duplicate

    Yeah I get that problem of double posting from my buffering connection too.

  • Today at 3:57 pm
    Javelyn

    Geo101 writes...

    duplicate

    Yeah I get that problem of double posting from my buffering connection too.

  • Today at 4:03 pm
    Harry

    Blackpaw writes...

    iven the address lookup on it doesn't work I am not filled with optimism.

    You can put in your telphone exchange name and it works or alternatively just navigate the map to your address

  • Today at 4:03 pm
    Jack.Daniels

    Geo101 writes...

    The linecard supports many speeds and configurations.

    No, a linecard is a linecard. It will have x number of y physical interfaces. 'Many configurations' might mean that you can bundle interfaces on the linecard into a single logical interface, but if you want to exceed that limitation you have to replace the linecard with one that has higher bandwidth interfaces. Then the chassis itself would need to support fabric switching at the levels that the new card introduces, or you're going to see throughput at a level less than the interfaces are capable.

    Do you think NBN would be wasting money on aggregation switches if it was cheaper to provide 10G uplinks for each and every DSLAM nationwide?

    Of course I do, the entire design of this NBN network reeks of wasted expenditure that will need to be replaced sooner rather than later. So of course purchasing hardware from a vendor that won't suit a sensible upgrade path is likely to have occurred. If the aggregation switches don't have sufficient capacity to be upgraded along with the demand of the subscribers, i.e at least modular interfaces that can be changed out for 10G modules, then when the node capacity is reached there will be a substantial cost in upgrading. 384 subscribers all buying a 100mbit/s service, and expecting Netflix during the peak times, will see your 1G links redundant in a very small amount of time.

  • Today at 4:04 pm
    jwbam

    Mazdafan writes...

    What were they really thinking when they designed this FTTN network?

    that the existing copper network that already reaches and connects most homes and businesses across the nation gives its owner, now Telstra, a huge monopolistic advantage over any competitor � this must be maintained at all costs ... it must be UPGRADED to better meet future needs, rather than replaced by a new purpose-built network that could be shared equally by all providers.

  • Today at 4:04 pm
    Harry

    sorry duplicate post. wtf is going on ? how did I do it

  • jwbam

    texmex writes...

    It may have happened to change about the same time as he started promoting the FTTP-based NBN, but it's hard to see any connection. Imposition of government Net censorship is always a very bad idea; once such controls are in place, the capacity for scope creep in censored content is always irresistable.

    oh, sorry I didn't mean to suggest it was a strong connection, only that his relationship with WP and techies in general had changed

    I think the filter went away mainly because it was originally suggested due to pressure from conservative Christian groups that held the balance of power before the 2010 election. After 2010, we got a hung parliament, but the ACL became irrelevant, replaced by Katter, Oakeshot and Windsor.

  • Majorfoley

    Deadly Chicken writes...

    Morrow claims FTTN will enhance Australia for 100 years, he also talks about the possibility of launching another satellite....

    Will someone knock some F***ing sense into this asshole? god damnit how did this guy even manage to get to be the head of vodafone in the first place? His such a freaking idiot! I hope he crash and burns when Australia realizes they are being duped. Very slim chance that they will wake up because of mainstream media but if that small chance happens i would love to see him survive the publicity.

  • Today at 4:19 pm
    jwbam

    when I make a dup post, it's often because I hit the Post Reply button instead of Mark as Read. Then hitting Send instead of Mark as Read (unfortunately all around the same spot) The new Post interface automatically reuses text from your last post.

  • Today at 4:19 pm
    marty17

    Majorfoley writes...

    god damnit how did this guy even manage to get to be the head of vodafone in the first god damn place?

    Maybe a US media magnate gave him a reference .

  • Today at 4:20 pm
    Jack.Daniels

    jwbam writes...

    I think the filter went away

    I hasn't 'gone away', it's just evolved into 1) metadata retention, and 2) legislation for mandatory site blocking. It's no longer a 'filter', it's a blanket ban on any site that any interested party wants to ban if they spend the money on lawyers and take it to court. And there's always the meta data to single out those people that wanted to use the site in the first place... in case the interested party wants to recoup their court costs.

    And the TPP made all this possible.

  • Today at 4:20 pm
    Majorfoley

    marty17 writes...

    Maybe a US media magnate gave him a reference .

    Reference to the NBN sure thats the only way i reckon he got that job. Vodafone however...

  • Today at 5:51 pm
    -prl-

    Blackpaw writes...

    Given the address lookup on it doesn't work I am not filled with optimism.

    Address lookup on the ACCAN "ADSL underserved" page worked just fine for me.

  • Today at 5:51 pm
    texmex

    Javelyn writes...

    Yeah I get that problem of double posting from my buffering connection too.

    Yeah I get that problem of double posting from my buffering connection too.

    Naturally we're all full of sympathy � at least all of us who have to put up with the exact same problem!

  • Today at 6:15 pm
    texmex

    marty17 writes...

    Maybe a US media magnate gave him a reference.

    Surely that's improbable?

    I mean, just how many people who are US citizens and who are media magnates would any intelligent, sensible adults-now-in-charge government allow to do such a thing?

  • Today at 6:15 pm
    Phg

    CMOTDibbler writes...

    I think the legislation that requires any competing network to be wholesale only makes the business case very difficult.

    I don't expect that legislation to last too long.

    At some point we'll be presented with an option of really really expensive wholesale monopoly broadband or less expensive and higher quality broadband from vertically integrated RSPs who are can both wholesale and retail.

  • Today at 6:24 pm
    ltn8317g

    Harry writes...

    sorry duplicate post. wtf is going on ? how did I do it

    The WP site has been a bit dicky for a few days, with it often waiting a minute after a click before anything happens. I'm hoping they may yet fix it.

  • Today at 6:24 pm
    texmex

    Jack.Daniels writes...

    It hasn't 'gone away'

    No; a latent threat of government Net censorship has merely been moved discreetly out of public view, waiting for the right moment to resusitate it.

    Both sides of politics were happy with the focus on NBN/MTM, since they could keep their respective adversarial positions. The Coalition said NBN (among other things) 'provided fast access to porn and other illegal content.' � but porn isn't illegal, while all paedophile material is (rightly) illegal anyway.

    And the TPP made all this possible.

    Not yet, because the TPP isn't in place. But it will give far more power to US-based media corporations.

  • Today at 6:36 pm
    bythebrook

    Blackpaw writes...

    I'm totally confused new the new layout � can't even find where to load the map.

    https://nationalmap.gov.au

    Left hand side, blue box "Add data." Select National Data Sets -> Communications, then select 'Broadband Map" and on the right-hand-side of the screen 'Add to Map."

  • Today at 6:36 pm
    Jack.Daniels

    texmex writes...

    No; a latent threat of government Net censorship has merely been moved discreetly out of public view, waiting for the right moment to resusitate it.

    The bill, allowing for the blocking of internet content based on the filings from stakeholders, was passed into law in June 2015... it was an amendment to the Australian Copyright Act 1968.

    http://arstechnica.com/tech-policy/2015/06/australia-passes-controversial-anti-piracy-web-censorship-law/

    Foxtel have already moved to utilise these changes to prop up their failing business model in Australia.

    Other material being blocked is done under other existing laws, i.e child pornography. But the amendment last year was specifically to protect copyright holders' rights to make us pay more for content in Australia.

  • RockyMarciano

    https://www.thesaturdaypaper.com.au/opinion/topic/2016/09/17/malcolm-turnbulls-biographer-turns-the-pm/14740344003733

    If not posted already.

    ike millions of Australians, I fear I may have overestimated Malcolm Turnbull

    his morphing of the national broadband network into a multi-technology mix, or MTM, otherwise known as Malcolm Turnbull�s Mess

  • horus81

    Harry writes...

    local community Facebook site.

    Harry, do you have a link?

  • Today at 6:50 pm
    cw

    Geo101 writes...

    Like I said, DSLAMS come stock standard from the factory with 1G links. There is a reason for that.

    There are is, the person that placed the order specified it.